In Jumeirah Village Circle · by Tabeer
99 Park Place by Tabeer handover date: what happens next
99 Park Place is almost finished but past its planned date, the end of 2025, and listings now give Q4 2026. We watch for Tabeer’s handover notice and take the handover off your hands.
Developer’s render · TabeerHandover date
Q4 2026The date listings give now. The registered one has passed.
Next step
The completion certificateThen Tabeer’s handover notice
Homes
99Studios to 2 bedrooms, in one eight-floor building
Developer
TabeerJumeirah Village Circle
Where 99 Park Place is now, and the steps to your keys
Where 99 Park Place stands, and each step to your keys
99 Park Place is near the end of its build, a little behind most JVC buildings around it: five are a few points further on and two are level. We send you each new inspection result the day it appears.
Work started
May 2024, the project start DXBinteract shows from Land Department data.
Planned date
The completion date registered with the Land Department, now passed.
Last inspection
90% built.
Not finished yet. The planned date of 31 December 2025 has passed, and Tabeer has not sent handover notices.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Tabeer starts sending handover notices.
Handover notice
Tabeer asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Tabeer the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Sources: Dubai Land Department; DXBinteract (project start).
Progress over time
99 Park Place completion date: is it moving fast enough?
The planned date has passed, so the chart compares the speed of 99 Park Place with what it needs for Q4 2026, the date listings give. Tabeer has given no current date of its own.
Source: Dubai Land Department
Speed so far
3.1% a month90% in the 29 months from May 2024 to the last inspection
Needed for the listings’ date
~3.3% a monththe remaining 10% in the 3 months from the last inspection to the end of December 2026
What this means
The building has gone up a little slower than it needs to now, so Q4 2026 may slip. The final points of a build often take longer, and the keys follow the completion certificate. Keep the handover money ready; Tabeer’s notice sets your date.
Handover costs
99 Park Place handover costs to budget for
If you are on the payment plan most listings quote, the last payment is the biggest line on your bill. Tabeer’s fees, the service charge in advance and the DEWA deposit are added to it.
Typical figures for 2026. Tabeer’s bill has the exact amounts, and we check them with you line by line.
Snagging
Snagging at 99 Park Place: what to check first
Snagging is the flat inspection after Tabeer’s notice and before you sign for the keys, and we do it for you. Every fault in the snagging report by then is Tabeer’s to repair. Four checks come first here.
Studios, where tenants notice faults
Four in ten homes here are studios, from about 416 sq ft. A slow drain, a loose tile or weak cooling shows at once in so small a room, so we try each fitting.
A private pool, if yours has one
Listings show some two-bed flats with a study with a small pool of their own. We run the pump and check the tiles and the waterproofing before you accept it.
The roof and the flat below
The building has eight floors on the record. We look for damp in the top-floor ceilings and along the roof edges, and run the water so no leak reaches the flat below unseen.
Ready when the notice comes
The planned date passed almost a year ago and the building was 90% built in October. Tabeer’s notice may come with little warning, so we ask for your inspection date once booking opens.
What this means
List every fault in writing, with photographs, before you sign for the keys. Tabeer repairs every listed fault at its own cost before you move in, and we check each repair.
From AED 1,599 we carry out the flat inspection at 99 Park Place for you and send Tabeer the list of faults, each with a photograph.
Service charge
The 99 Park Place service charge, estimated
Tabeer has not published a service charge for 99 Park Place yet, so this is an estimate. The list gives the Land Department’s rates for finished JVC buildings by other developers, which show the likely range.
Your yearly service charge
~AED 6,460
about AED 540 a month
Your size × the middle rate of the JVC buildings nearby. A 99 Park Place studio is about 416 sq ft.
The same flat in each JVC building nearby, a year
Source: Dubai Land Department service charge index, via DXBinteract
Furnish or not?
Furnish your 99 Park Place flat, or let it empty?
Studios are the most common home at 99 Park Place, and you can let yours furnished or empty. With 10 Oxford, Q Gardens Lofts and other JVC buildings also near the finish, tenants will have many new flats to compare.
99 Park Place’s homes by layout
Which is yours?
The most common home here is the studio: 43 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
In a studio of about 416 sq ft, the layout of the furniture decides whether the room feels small. Good interior design gives sleeping, cooking and a desk their own place, which helps yours stand out.
Send us your layout. You get a furnishing proposal for your 99 Park Place flat, with its cost and the rent to expect.
Buildings around
99 Park Place and the buildings around it in JVC
99 Park Place is one of several JVC buildings near the finish; the list gives each with its developer, and the finished buildings nearby.
Already finished
Being built
Source: Dubai Land Department
What this means
Terrazzo Residences, 10 Oxford, Samana Waves and four others are close to finishing too: with 99 Park Place, about 2,200 new homes. Tenants in JVC will have many new flats to look at. A flat in good order, ready for a tenant soon after you get the keys, stands out.
The developer
Tabeer handovers: how they work and who to call
How Tabeer hands over homes, and how many of its projects are past their date.
About Tabeer
Tabeer writes to each owner with a handover notice when a building is ready. It has finished three projects in Dubai, the latest in Arjan this year, and 99 Park Place is the only one of its projects now past its planned date.
Handover
How handover is booked
Tabeer’s six projects in the Land Department records
- Finished3
- Being built, date still ahead2
- Being built, past their date yours1
- Being built, no finish date given0
Source: Dubai Land Department
What this means
Tabeer’s two other projects under way both have dates still ahead, so 99 Park Place is its only one past its date now. It is near the finish, a little behind its closest JVC neighbours, so the notice could come soon. From abroad, we answer Tabeer’s notice for you.
Write to us now and we tell you when Tabeer’s notices for 99 Park Place go out, and what yours will ask you to pay.
Location
99 Park Place location, and what is around it
99 Park Place stands in Jumeirah Village Circle, among many new buildings. It is one small block, with a pool and a gym according to listings, and Tabeer has a second project registered in the same community.
By car
Around you
Questions
99 Park Place: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the 99 Park Place handover date?
The planned date registered with the Dubai Land Department for 99 Park Place, 31 December 2025, has passed. Listings now give Q4 2026; Tabeer has published no current date. The building was 90% built at the inspection of 12 October 2026. Your own date comes in Tabeer’s handover notice.
Is 99 Park Place late?
Against the planned date, yes. Since work began it has gone up at about 3.1% a month, and it needs about 3.3% a month to finish by the end of December 2026, the date listings give. So that date may slip a little. A new inspection will show the pace.
What should I check in my 99 Park Place flat before accepting it?
The kitchen and bathroom fittings, the cooling, the pool and its pump if your flat has one, and damp in the top-floor ceilings. Every fault you list in writing before you sign for the keys is Tabeer’s to repair.
How much do I pay at the 99 Park Place handover?
If you are on the 60/40 plan most listings quote, 40% is due at handover, when the notice asks for it. Tabeer’s fees, the service charge in advance, the DEWA deposit and the title deed fee come on top. Your sales agreement shows your plan.
What will the service charge be at 99 Park Place?
Tabeer has not published it yet. Owners in finished JVC buildings pay from about AED 10 to 19 per sq ft a year, about AED 16 in the middle, through Mollak. For a studio of about 416 sq ft that is roughly AED 6,460 a year.
Can I take over my 99 Park Place flat from abroad?
Yes. We check Tabeer’s bill, do the flat inspection, open the DEWA account in your name and collect the keys for you. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Tabeer’s notice to a tenant in your 99 Park Place flat
At 99 Park Place we book your flat inspection as soon as the notice comes, check Tabeer’s bill against your plan, test any private pool, and collect the keys. Then we do the interior design so your flat stands out, find a yearly tenant and take on the property management.
What we do for your flat
- 01
The handover with Tabeer.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for 99 Park Place
Leave your details. We write after each new inspection of 99 Park Place and tell you what it means for your handover notice.
On a computer? Scan to open WhatsApp on your phone, with the message ready.