In Business Bay · by Al Habtoor
Al Habtoor Tower handover date: what happens next
Al Habtoor Tower is almost finished, and its planned date is only weeks away. We follow each new inspection, check Al Habtoor’s bill when the notice comes, and handle the handover while you are abroad.
Developer’s render · Al HabtoorHandover date
Dec 2026The registered completion date. Your handover notice gives the date that counts.
Next step
The completion certificateThen Al Habtoor’s handover notice
Homes
1,739One to three bedrooms and one five-bed, in one tower in Al Habtoor City
Developer
Al HabtoorBusiness Bay
Where Al Habtoor Tower is now, and the steps to your keys
Al Habtoor Tower today, and every step to your keys
Al Habtoor Tower is in its last stretch. Only Burj Pacific is further along among the towers going up in Business Bay. We send you each new inspection the day the record shows it.
Work started
The day of Al Habtoor’s groundbreaking ceremony.
Last inspection
90% built.
In the last tenth of the work. Al Habtoor’s own date, Q3 2026, has passed; the planned date, 31 December 2026, is still ahead.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Al Habtoor starts sending handover notices.
Handover notice
Al Habtoor asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Al Habtoor the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
Al Habtoor Tower completion date: is it moving fast enough?
Al Habtoor Tower is going up a little slower than its planned date needs, and that date is only weeks away. Below, its speed so far sits beside the speed it needs.
Source: Dubai Land Department
Speed so far
2.3% a month90% in the 40 months from May 2023 to the last inspection
Needed for 31 December 2026
~2.5% a monththe remaining 10% in the 4 months from the last inspection to the planned date
What this means
At its speed so far the tower would be finished around January 2027, and the first keys could follow in the months after. Keep the money for the last payment ready from December, but do not count on a date until the notice arrives.
Handover costs
Al Habtoor Tower handover costs to budget for
On the plan most listings quote for Al Habtoor Tower, the last instalment is the largest single payment, and it falls due at handover. Fees and deposits are added to it.
Typical figures for 2026. Al Habtoor’s bill has the exact amounts, and we check them with you line by line.
Snagging
Snagging at Al Habtoor Tower: what to check first
When Al Habtoor’s notice comes, the flat inspection is booked through Al Habtoor, and we book it for you. Every fault reported in writing before you sign is Al Habtoor’s to repair. In this tower, four checks come first.
Ask for your date at once
The tower has 1,739 homes, and Al Habtoor planned more than 1,300 for its first phase. With so many flats, we ask for your inspection date the day the notice arrives.
Windows and balcony doors up high
The tower rose 86 floors. Wind, dust and summer heat test every seal up there, so we close each window and balcony door and look for gaps and stains.
Kitchen and bathroom in a one-bed
Most homes here are one-beds, where the kitchen and bathroom get the most use. We try every appliance, tap and drain, and list what fails.
Leaks that show downstairs
The flats are stacked one above another. A slow drain or a seal that weeps in your bathroom shows first in the ceiling below, so we run water and watch for it.
What this means
Send Al Habtoor every fault in writing, with photographs, before you accept the keys. Then each repair is Al Habtoor’s to make, at its cost, and we check it before you sign.
From AED 1,599 we do the flat inspection at Al Habtoor Tower for you and send Al Habtoor the snagging report, with a photograph of each fault.
Furnish or not?
Furnish your Al Habtoor Tower flat, or let it empty?
Most homes in Al Habtoor Tower are one-beds, and hundreds of them may reach tenants at the same time, alongside new flats in Burj Pacific and Chic Tower. A tenant will have many similar flats to choose from.
Al Habtoor Tower’s homes by layout
Which is yours?
Most homes here are 1-beds: 1,034 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
When the flats around yours are just as new and laid out the same way, interior design and good furniture help a tenant pick yours. Photographs of a furnished flat also show tenants how they would live in it.
Send us your flat number. We reply with a furnishing proposal, its cost and the rent to expect, so a tenant can move in soon after the keys.
Buildings around
Al Habtoor Tower and the towers around it in Business Bay
Al Habtoor Tower is one of the towers going up in Business Bay, among finished buildings that include the three older towers of Al Habtoor City.
Already finished
Being built
Source: Dubai Land Department
What this means
Burj Pacific, Chic Tower and West Bay Tower are at a similar stage to Al Habtoor Tower, so about 2,600 new homes may reach tenants within months of each other. Most of them are in Al Habtoor Tower itself. If you plan to let, start looking for a tenant the week you get the keys.
The developer
Al Habtoor handovers: how they work and who to call
How Al Habtoor hands over homes, and how many of its projects are past their date.
About Al Habtoor
Al Habtoor’s record is short: one finished project, Al Habtoor City, and two being built. Al Habtoor Tower is one of the two, and its planned date is still ahead.
Handover
How handover is booked
Al Habtoor’s 3 projects in the Land Department records
- Finished1
- Being built, date still ahead yours1
- Being built, past their date0
- Being built, no finish date given1
Source: Dubai Land Department
What this means
When the tower topped out in 2026, Al Habtoor spoke of a first phase in summer 2026. That has slipped, but the tower is close to finished and the notice may come within months. While you are abroad, we answer it and deal with Al Habtoor for you.
Write to us now. We tell you what Al Habtoor’s notice will ask of you, and we watch the record until the tower is finished.
Location
Where Al Habtoor Tower is: Al Habtoor City, on the canal
Al Habtoor Tower stands in Al Habtoor City, on Sheikh Zayed Road at the edge of Business Bay, beside the Dubai Water Canal and Al Habtoor’s hotels. Downtown Dubai is a short drive away.
By car
Around you
Questions
Al Habtoor Tower: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Al Habtoor Tower handover date?
Al Habtoor Tower’s planned date, the completion date registered with the Dubai Land Department, is 31 December 2026. Al Habtoor’s own date, Q3 2026, has passed. The tower was 90% built at the inspection of 31 August 2026. Your own date comes in Al Habtoor’s handover notice.
Is Al Habtoor Tower delayed?
Al Habtoor Tower is going up a little slower than its planned date needs. Since May 2023 it has been built at about 2.3% a month, and it needs about 2.5% a month to finish by the end of December 2026. At its speed so far it would be finished around January 2027.
What should I check in my Al Habtoor Tower flat before accepting it?
The windows and balcony doors, above all on high floors, the kitchen appliances, every tap and drain, the air conditioning in each room, and signs of leaks. Al Habtoor repairs what you list in writing before you sign for the keys.
How much do I pay at the Al Habtoor Tower handover?
It depends on your plan. If you are on Al Habtoor’s 60/40 plan, the one most listings quote, 40% of what your flat cost is due at handover. Al Habtoor’s fees, the service charge in advance and the DEWA deposit are added to it.
Can I take over my Al Habtoor Tower flat from abroad?
Yes. We check Al Habtoor’s bill, do the flat inspection, open the DEWA account in your name and collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Al Habtoor’s notice to a tenant in your flat
At Al Habtoor Tower we book your flat inspection the day the notice comes, check the bill for the last payment, and test the windows high up and every tap and drain. After the keys come interior design, a tenant on a yearly lease and property management.
What we do for your flat
- 01
The handover with Al Habtoor.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Al Habtoor Tower
Leave your details. We tell you where Al Habtoor Tower stands against the planned date, and write again after each new inspection.