In Arjan · by Binghatti

Being built

Binghatti Hillcrest handover date: how close is the building?

The planned date for Binghatti Hillcrest is six weeks away, and the last inspection on record found the building a little past halfway. We watch for the next inspection and tell you what it means for your keys.

BuiltChecked by the Land Department · 17 Sep 2026
60%builtDue Dec 2026
17 Sep 2026Last inspection31 Dec 2026Planned finish date
Binghatti Hillcrest in Arjan at night, the developer’s render, with bronze balcony frames and a glass lobbyDeveloper’s render · Binghatti

Handover date

Dec 2026

The registered completion date. Your handover notice gives the date that counts.

Next step

A new inspection

Then the completion certificate and Binghatti’s notice

Homes

368

Studios, one-bedroom and a few two-bedroom flats over 28 shops, in one low-rise building

Developer

Binghatti

Arjan

Where Binghatti Hillcrest is now, and the steps to your keys

Binghatti Hillcrest construction update, and every step to your keys

Binghatti Hillcrest is a little past halfway, and most of the buildings going up around it in Arjan are further along. Once you sign up, we send you the result of each new Land Department inspection of Binghatti Hillcrest.

Oct 2025
✓

Sales opened

Sales opened in October 2025, according to Property Finder. The Land Department figures we hold give no start date for the building work.

17 Sep 2026
✓

Last inspection

60% built.

Today

Under construction. The planned date, 31 December 2026, is six weeks away and still stands on the record.

To your keys
Next

New inspection results

We send you each one the day it appears. Progress over time →

100% and the completion certificate

After that, Binghatti starts sending handover notices.

Handover notice

Binghatti asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.

Snagging

We check the flat before you accept the keys, and send Binghatti the list of faults.

Keys

We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.

After the keys

Furnishing

If you want it furnished, we design and furnish the flat so it is ready for a tenant.

Your first tenant

We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.

Source: Dubai Land Department.

Progress over time

Binghatti Hillcrest completion date: is it moving fast enough?

Binghatti Hillcrest has gone up fast, but its planned date is close. Below, its pace since sales opened sits beside the pace it needs to reach that date.

0%50%100%2025202620272028Today60% at the last inspection, 17 Sep 2026Dec 2026 · registeredMid 2027 · speed so far0%50%100%2025202620272028Today60% · 17 Sep 2026Dec 2026Mid 2027

Source: Dubai Land Department

Speed so far

5.0% a month

60% in the 12 months from the start of sales in October 2025 to the last inspection

Needed for 31 December 2026

~13.3% a month

the remaining 40% in the 3 months from the last inspection to the planned date

What this means

The building has gone up quickly, but it would have to go much faster still to be done by the planned date. So keys later than December look likely. Keep the money for your last payment ready, but do not plan a move or a first tenant around December. The next inspection will show more.

Buildings around

Binghatti Hillcrest and the buildings around it in Arjan

Binghatti Hillcrest is one of eleven buildings going up in Arjan, listed here by how far each has come, beside six already finished there.

Already finished

✓Samana Greens✓Samana Hills✓Samana Park Views✓Joya Dorado Residence✓48 Parkside✓Marquis Elegance

Being built

Samana Mykonos Signature276 homesSamanaWas due Apr 2026
86%
Aryene Greens125 homesDiamond StarWas due Nov 2022
80%
Rose Gardens 349 homesCavaraWas due May 2026
76%
Ashley Hills616 homesTownxDue Mar 2027
74%
One Beverly389 homesHMBDue Dec 2026
73%
Samana Skyros441 homesSamanaWas due Apr 2026
71%
Elano by Oro24339 homesOro24Was due Oct 2025
70%
Gardens 2223 homesImanWas due Dec 2025
68%
Vincitore Volare415 homesVincitoreWas due Jun 2025
63%
Empire Estates344 homesEmpireDue Dec 2026
60%
Binghatti HillcrestYoursBinghattiDue Dec 2026
60%

Source: Dubai Land Department

What this means

Samana Skyros, Elano by Oro24, Gardens 2, Vincitore Volare and Empire Estates are at a similar stage to Binghatti Hillcrest on the record. If their keys go out within months of each other, tenants in Arjan will have many new flats to compare. If you mean to let, have yours ready soon after the keys.

Handover costs

What you pay Binghatti at the Hillcrest handover

If you are on one of the plans quoted for Binghatti Hillcrest, the last instalment is the biggest line on your bill, and your plan sets its size. Binghatti’s fees and the refundable deposits follow.

Last paymentAs in your sales agreementQuoted plans for Binghatti Hillcrest differ, from 30% to 60% due at handover. Your sales agreement shows yours.
Binghatti’s handover and admin feesBinghatti doesn’t publish these
Service charge, paid in advanceShown on your bill
Electricity and water (DEWA)AED 2,000 deposit + about AED 130 fees
Air conditioning (cooling)The deposit depends on the company
Title deedAbout AED 250–600
Snagging (checking the flat for faults)From AED 1,599

Typical figures for 2026. Binghatti’s bill has the exact amounts, and we check them with you line by line.

Furnish or not?

Binghatti Hillcrest: furnish your flat or let it empty?

Furnish your Binghatti Hillcrest flat, or let it as it is? More than half the flats here are studios, and Samana Skyros, Gardens 2 and Empire Estates are at a similar stage nearby, so tenants will weigh many new flats side by side.

Binghatti Hillcrest’s homes by layout

Which is yours?

Most homes here are studios: 207 of them.

Studio20756%
1-Bed15743%
2-Bed41%

Source: Dubai Land Department

A similar flat in another building, empty and furnished

A one-bedroom living room in a finished Binghatti tower in Jumeirah Village Circle, furnished
A one-bedroom living room in a finished Binghatti tower in Jumeirah Village Circle, empty
UnfurnishedFurnished‹ ›
  • ✓Stands out next to similar flats on rental websites
  • ✓Tenants see how they would live in it
  • ✓Ready to move into, for tenants who don’t want to buy furniture

What this means

Where many new studios look alike, interior design and well-chosen furniture make yours stand out in the photographs. A furnished studio is ready to move into, which usually shortens the wait for the first tenant.

Send us your layout, and we return a furnishing plan with its cost and the rent to expect furnished and empty.

Furnish my property for me

While you wait

Binghatti Hillcrest: while you wait for the keys

Four things to do now, so your Binghatti Hillcrest handover goes smoothly from abroad.

01

Keep instalments on time

If you are on one of the quoted plans, the payments during construction come first and the rest is due with the handover notice. Set that sum aside now, so it is ready when the notice comes.

02

Choose who checks the flat

In a studio, the kitchen, the bathroom and the cooling sit close together, and the lowest flats are above shops, so each needs checking. We do the flat inspection at Binghatti Hillcrest and send Binghatti the faults in writing.

03

Live in it or let it

Settle before the notice whether the flat is for you or for a tenant. A flat that will be let can then be furnished and photographed soon after the keys.

04

Follow each inspection

The planned date is close and the building was a little past halfway in September. When the next inspection is recorded, we write with what it changes for your keys.

We run your Binghatti Hillcrest handover while you stay abroad: we check the bill, do the flat inspection, open DEWA and collect the keys. You make the payment.

Get my handover plan

The developer

Binghatti handovers: how they work and who to call

How Binghatti hands over homes, and how many of its projects are past their date.

About Binghatti

When a Binghatti building is ready, each owner gets a notice with the bill and when the flat inspection and the keys can be booked. Binghatti Hillcrest is not yet among the Binghatti projects past their planned date, though its date is close.

Handover

How handover is booked

BookingWith Binghatti, once the handover notice arrives
Flat inspection and keysThe handover notice says when they can be booked.
Bill, payments, documentsFrom Binghatti, with the notice
Phone800 15, Binghatti’s hotline in the UAE

Binghatti’s 78 projects in the Land Department records

  • Finished43
  • Being built, date still ahead yours21
  • Being built, past their date13
  • Being built, no finish date given1
Homes in finished projects13,573
Projects being built now35

Source: Dubai Land Department

What this means

Over a third of Binghatti’s projects being built are past their planned date, so read December as a target. Most buildings around Binghatti Hillcrest are further along, and only the next inspection will show how near it is to finished. When the notice comes, we act for you in Dubai.

Write to us now, and we let you know when Binghatti sends its notice for Binghatti Hillcrest and what it asks of you.

Get my handover plan

Location

Binghatti Hillcrest location, and what is around it

Binghatti Hillcrest stands in Arjan, a district of apartment buildings close to Dubai Miracle Garden. Umm Suqeim Road and Sheikh Mohammed Bin Zayed Road are close by, and Mall of the Emirates is a short drive away.

By car

Dubai Miracle Garden~5 min
Mall of the Emirates~10 min
Dubai Marina~20 min
Downtown Dubai~20 min

Around you

GardenDubai Miracle Garden, a few minutes away
RoadsUmm Suqeim Road and Sheikh Mohammed Bin Zayed Road
Shops28 shops on the record, on the ground floor according to listings
AreaAl Barshaa South Third, Arjan’s name in the Land Department records

Questions

Binghatti Hillcrest: what owners ask

Something not here? Ask us on WhatsApp; we reply within 30 minutes.

When is the Binghatti Hillcrest handover date?

The Binghatti Hillcrest completion date registered with the Dubai Land Department, which we call the planned date, is 31 December 2026. The building was 60% built at the inspection of 17 September 2026. The date for your own flat is the one in the notice Binghatti sends you.

Is Binghatti Hillcrest on time?

Binghatti Hillcrest looks unlikely to meet its planned date of 31 December 2026. Counted from the start of sales in October 2025, it has gone up by about 5.0% a month, and it needs about 13.3% a month from the September inspection. The next inspection will show whether the work has picked up.

What should I check in my Binghatti Hillcrest flat before the keys?

In a studio, run the cooling, the kitchen taps and the shower at the same time. In the lowest flats, listen for noise from the shops below; on the top floor, look for damp in the ceilings. Check the kitchen fittings against your agreement. Every fault goes to Binghatti in writing before you sign for the flat.

How much do I pay at the Binghatti Hillcrest handover?

At the Binghatti Hillcrest handover, your plan sets the last payment: if you are on Binghatti’s 20/50/30 plan, 30% is due; on its 50/50 plan, half. Binghatti’s fees, the service charge in advance, the DEWA deposit and the title deed fee sit on that same bill. The plan you signed up to is set out in your sales agreement.

Can I receive my Binghatti Hillcrest flat from abroad?

Yes. Our team in Dubai reads Binghatti’s bill with you, does the flat inspection, opens DEWA in your name and picks up the keys. If the developer requires a power of attorney, we arrange it with you remotely.

Our service

From Binghatti’s notice to a tenant in your Binghatti Hillcrest flat

For your Binghatti Hillcrest flat we follow the inspections, check the bill, and test the cooling and the drains before you sign, listening for noise from the shops in the lowest flats. Then we handle interior design and furniture, find a yearly tenant and stay on with property management.

Illustrative photo

What we do for your flat

  1. 01

    The handover with Binghatti.

  2. 02

    The inspection for faults.

  3. 03

    Design and furnishing.

  4. 04

    A tenant, and the rent sent to you.

  5. 05

    Looking after it year to year.

Free updates and a handover plan

Your handover plan for Binghatti Hillcrest

Leave your details, and we write when the next inspection of Binghatti Hillcrest is recorded, with what it means for your keys.

100+properties handledNo needto fly in30 minto reply, any time

Your unit

Keep me updated

On a computer? Scan to open WhatsApp on your phone, with the message ready.