In Jumeirah Village Circle · by Binghatti
Binghatti Ruby handover date and construction status
The planned date for Binghatti Ruby passed in February, and Binghatti has not set a new one. The last inspection on record is from July, so the tower is probably further on by now. We will tell you when the next one is recorded.
Developer’s render · BinghattiHandover date
Not setYour handover notice gives the date that counts.
Next step
A new inspectionThen the completion certificate and Binghatti’s notice
Homes
572Studios to three-bedroom flats, in one 26-floor tower
Developer
BinghattiJumeirah Village Circle
Where Binghatti Ruby is now, and the steps to your keys
Binghatti Ruby construction update, and every step to your keys
Binghatti Ruby is a little under halfway, and six of the buildings going up around it in JVC are further along. Whenever the Land Department records a new inspection of Ruby, we send it to you.
Sales opened
Binghatti was selling Ruby by February 2025, according to dubizzle. The Land Department figures we hold give no start date for the building work.
Planned date
The completion date registered with the Land Department, now passed.
Last inspection
46% built.
Still being built, past its planned date of 28 February 2026. Binghatti has set no new date.
New inspection results
We send you each one the day it appears.
100% and the completion certificate
After that, Binghatti starts sending handover notices.
Handover notice
Binghatti asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Binghatti the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Buildings around
Binghatti Ruby and the towers around it in JVC
Ten other buildings are under way in JVC at a stage close to Ruby, and six Binghatti towers have finished nearby. Ruby sits among them below.
Already finished
Being built
Source: Dubai Land Department
What this means
Ten other buildings in JVC, from Samana Waves 2 to Binghatti Amberhall, are at a stage close to Ruby. If their keys go out in the same season, tenants in JVC will have many new flats to choose from. If you plan to let, have the flat ready soon after the keys.
Service charge
Binghatti Ruby service charge
Binghatti has not published a service charge for Ruby yet, so this is an estimate. The list shows the Land Department’s rates for Binghatti’s own finished towers in JVC, the closest guide we have. Owners pay it through Mollak.
Your yearly service charge
~AED 7,280
about AED 610 a month
Your size × the middle rate of the Binghatti towers nearby. A Binghatti Ruby studio is about 410 sq ft.
The same flat in each Binghatti tower nearby, a year
Source: Dubai Land Department service charge index, via DXBinteract
Handover costs
Binghatti Ruby handover costs to budget for
If you are on the plan Binghatti quotes for Ruby, the last instalment is the biggest line on your handover bill. Binghatti’s own charges and the refundable deposits are added to it.
Typical figures for 2026. Binghatti’s bill has the exact amounts, and we check them with you line by line.
Furnish or not?
Binghatti Ruby: furnish your flat, or let it empty?
Your Ruby flat comes empty. More than half the homes in the tower are studios, and ten other buildings in JVC, among them Samana Waves 2, are at a similar stage, so a tenant may compare many bare flats at once.
Binghatti Ruby’s homes by layout
Which is yours?
Most homes here are studios: 319 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
When small flats look alike, the finish decides which is let first. Interior design and furniture make a studio look ready in the photographs, and a tenant can move in at once.
Send us your layout. You get a furnishing plan with its cost, and the rent to expect with furniture and without it.
While you wait
Binghatti Ruby: while you wait for the keys
Four things to do now, so your Binghatti Ruby handover goes smoothly from abroad.
Keep instalments on time
If you are on the 20/50/30 plan, the construction instalments come first and the last 30% falls due with the handover notice. Set that sum aside early, so it is ready when the notice arrives.
Choose who checks the flat
In a small flat a leak from the kitchen, the bathroom or the air conditioning soon reaches the floors and walls. Our flat inspection tests the taps, drains, cooling and windows, and Binghatti gets the faults in writing.
Live in it or let it
Settle early whether the flat is your home or a rental. If you let, the furniture and photographs can start on the day you collect the keys.
Hear about each inspection
The planned date has passed and the last inspection is from July, so the next one is the best guide to your keys. We tell you when it is recorded and what it means.
We take over your Binghatti Ruby handover while you stay abroad: we check the bill, do the flat inspection, open DEWA and collect the keys.
The developer
Binghatti handovers: how they work and who to call
How Binghatti hands over homes, and how many of its projects are past their date.
About Binghatti
Once a tower is ready, Binghatti sends owners a handover notice with the bill and says when the flat inspection and the keys can be booked. Ruby is one of several Binghatti projects now past their planned date.
Handover
How handover is booked
Binghatti’s 78 projects in the Land Department records
- Finished43
- Being built, date still ahead21
- Being built, past their date yours13
- Being built, no finish date given1
Source: Dubai Land Department
What this means
More than a third of the projects Binghatti is building are past their date, so go by the inspections rather than the announced dates. Six buildings around Ruby are further along, and Ruby’s next inspection will show how fast it is moving. From abroad, leave the notice to us.
Give us your flat number now, and we read Binghatti’s notice with you the day it comes: what it asks for and the deadlines.
Location
Binghatti Ruby location, and what is around it
Ruby stands in Jumeirah Village Circle, between Al Khail Road and Sheikh Mohammed Bin Zayed Road, about 5 minutes by car from Circle Mall.
By car
Around you
Questions
Binghatti Ruby: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Binghatti Ruby handover date?
The Binghatti Ruby completion date registered with the Dubai Land Department, which we call the planned date, was 28 February 2026, and it has passed. The Q1 2026 that Binghatti gave is behind us as well. The tower was 46% built at the inspection of 23 July 2026. Binghatti will give your day in its handover notice.
Is Binghatti Ruby late?
Yes, Binghatti Ruby is past its planned date of 28 February 2026, and Binghatti has set no new one. Counted from February 2025, when Binghatti was already selling it, the tower has moved about 2.6% a month. The next inspection will show whether that speed holds.
What should I check in a Binghatti Ruby flat before the keys?
In a Binghatti Ruby flat, run every tap and drain and look for leaks around the bathroom and kitchen. Check the cooling in every room, and open and close each window and balcony door. Make sure the parking bay and access cards match your flat, and give Binghatti every fault in writing before you sign.
How much is due at the Binghatti Ruby handover?
If you are on Binghatti’s 20/50/30 plan, the last 30% falls due with the handover notice. Binghatti’s own fees, the first service charge, the DEWA deposit and the title deed fee come on top. Your sales agreement shows the plan you signed.
What will the Binghatti Ruby service charge be?
Binghatti has not published a rate for Ruby yet. In its finished towers in JVC, owners pay about AED 13 to 21 per sq ft a year, with about AED 18 in the middle. For a studio of about 410 sq ft, that comes to roughly AED 7,280 a year.
Can I take over my Binghatti Ruby flat from abroad?
Yes. Our team in Dubai checks Binghatti’s bill, does the flat inspection, opens DEWA in your name and collects the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
Binghatti Ruby: from the handover notice to a tenant
For a Binghatti Ruby flat we follow the inspections until the notice comes, check the bill, and test the cooling, drains, windows and access cards before you sign. After that come interior design and furniture if you want them, a tenant on a yearly lease, and property management.
What we do for your flat
- 01
The handover with Binghatti.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Binghatti Ruby
Leave your details and we write to you when the next inspection of Ruby is recorded, with what it means for your keys.
On a computer? Scan to open WhatsApp on your phone, with the message ready.