In Dubai Creek Harbour · by Emaar
Creek Waters handover date, progress and what comes next
Creek Waters is in the last fifth of its construction and has been building faster than its planned date requires. We pass on every new inspection, and when Emaar sends the notice we can do the whole handover for you.
Developer’s render · EmaarHandover date
Q3 2027Emaar’s estimate. Your handover notice gives the date that counts.
Next step
A new inspectionThen the completion certificate and Emaar’s notice
Homes
4501 to 5 bedrooms, in one tower
Developer
EmaarDubai Creek Harbour
Where Creek Waters is now, and the steps to your keys
Creek Waters now, and each step to the keys
Creek Waters is in the last part of its construction. Among the Emaar towers still being built in Dubai Creek Harbour, only two are further along. The steps below show what is still to come.
Work started
The date registered with the Land Department.
Last inspection
81% built.
Being built, and ahead of the speed it needs. The planned date is 30 September 2027.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Emaar starts sending handover notices.
Handover notice
Emaar asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Emaar the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
Is Creek Waters on time for September 2027?
Creek Waters has built faster since work began than it needs to from here to its planned date. The two cards set those speeds side by side.
Source: Dubai Land Department
Speed so far
2.3% a month81% in the 36 months from August 2023 to the last inspection
Needed for 30 September 2027
~1.4% a monththe remaining 19% in the 14 months from the last inspection to the planned date
What this means
At the speed so far the tower would be finished around April 2027, months ahead of the planned date. The last part of a build, the fit-out and the approvals, usually runs slower, so we would not count on that. Have your money ready by the planned date, and book travel only when Emaar’s notice gives your own date.
Buildings around
Creek Waters and the Emaar towers around it
Of the Emaar towers around Creek Waters, five are already finished and nine are being built, Creek Waters among them. The list shows how far each one is.
Already finished
Being built
Source: Dubai Land Department
What this means
Creek Waters 2, the sister tower, is at almost the same stage, and Aeon is a little further on. If the three finish within months of each other, many new flats will be offered to tenants in the same season. A flat that is furnished and advertised early has more to offer a tenant than a lower rent.
What it earns
Creek Waters rent: what a one-bed could earn
Emaar towers such as The Cove II and Palace Residences North were finished in Dubai Creek Harbour before Creek Waters and already have tenants. Their leases are the basis for what a flat here could rent for.
Expected rent for your flat type
AED 105k–130k a year
Key Homes rent estimate
We took the leases registered with the Land Department in The Cove II, Island Park II and Palace Residences North, towers here with first tenants in 2025 and 2026. Our estimate per sq ft, times the typical one-bed size, gives the middle of the range.
Our estimate.
Rent per sq ft a year, AED
Source: Dubai Land Department
What your flat could earn
We filled in both boxes from what homes cost at launch and a typical size. Change them to your own numbers.
How it adds up
Your yearly return (rental yield)
AED a year after costs, as a share of what you paid
What this means
The three towers do not agree closely: rent per sq ft in The Cove II is clearly lower than in the other two. Our estimate sits nearer the higher pair, so the real rent could also come in below the range. Once Creek Waters has its own leases, we will replace the estimate with real rents.
Send us your flat type and floor, and we work out the rent to expect for it and what stays with you after costs.
Service charge
Creek Waters service charge: a first estimate
Emaar has not yet published a service charge for Creek Waters. Seven of its finished towers in Dubai Creek Harbour have approved rates, and they show the range to expect. District cooling is billed apart from it.
Your yearly service charge
~AED 15,770
about AED 1,310 a month
Your size × the middle rate of the Emaar towers nearby. A Creek Waters one-bed is about 840 sq ft. Cooling is billed apart.
The same flat in each Emaar tower nearby, a year
Source: Dubai Land Department service charge index, via DXBinteract
Handover costs
Creek Waters handover costs: the last payment and the fees
If you are on Emaar’s usual plan for Creek Waters, the last instalment is a tenth of the flat’s cost, with nothing due after the keys. Emaar’s fees and the deposits come on top.
Typical figures for 2026. Emaar’s bill has the exact amounts, and we check them with you line by line.
Furnish or not?
Creek Waters: furnished or empty for your tenant?
Creek Waters flats come without furniture. The 1-Bed is the most common type. Creek Waters 2 beside it is at almost the same stage, so tenants may be choosing between new flats in both towers at the same time.
Creek Waters’ homes by layout
Which is yours?
The most common home here is the 1-bed: 185 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
Tenants compare photographs. With interior design and furniture chosen for the layout, your flat shows how the rooms can be used, while an empty one shows only walls and floor.
After the keys we furnish your Creek Waters flat to a design you approve from abroad, and photograph it for the advert.
While you wait
Creek Waters: four things to settle before the keys
Four things to do now, so your Creek Waters handover goes smoothly from abroad.
Know your last payment
If you are on Emaar’s 10/80/10 plan, only the last tenth of what the flat costs you is left for handover. Keep the construction instalments on time, so nothing is outstanding when the notice comes.
Name who will do the handover
Emaar runs the handover in its Emaar One app: the bill, the payment and the booking. We do all of it for you, with the flat inspection and the keys, while you stay abroad. Handover management →
Decide how the flat will be used
Letting it on a yearly contract and keeping it for yourself need different preparation. If it is for a tenant, the furniture can be chosen now and installed in the first weeks after the keys. Our services →
Watch for an early notice
Creek Waters is ahead of the speed it needs, so Emaar’s notice may come before the planned date. We tell you the day it does.
Appoint Key Homes for your Creek Waters handover, and we handle it in Emaar One from the notice to the keys. The updates cost nothing, whoever does your handover.
The developer
How Emaar hands over, and what it means at Creek Waters
How Emaar hands over homes, and how many of its projects are past their date.
About Emaar
Emaar does its handovers through the Emaar One app, where you receive the notice, pay and book. Creek Waters is one of many Emaar projects under construction, and its planned date is still ahead.
Handover
How handover is booked
Emaar’s 270 projects in the Land Department records
- Finished181
- Being built, date still ahead yours71
- Being built, past their date7
- Being built, no finish date given11
Source: Dubai Land Department
What this means
Few of the projects Emaar is building have passed their planned dates, and Creek Waters is ahead of the speed it needs. What takes time is the handover itself, and we can do it while you are abroad: the bill, the flat inspection and the keys.
We act for you in Emaar One from the notice to the keys, while you stay in your own country.
Location
Where Creek Waters stands in Dubai Creek Harbour
Creek Waters stands on Creek Island in Dubai Creek Harbour, Emaar’s waterfront community on Dubai Creek. Creek Beach, the marina promenade and Creek Central Park are within the community, and the Ras Al Khor Wildlife Sanctuary lies beside it.
By car
Around you
Questions
Creek Waters: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Creek Waters handover date?
The planned date is 30 September 2027. That is the completion date registered with the Dubai Land Department, and Emaar gives Q3 2027. Handover begins after the tower reaches 100% and receives its completion certificate. Your own date is the one Emaar writes in your handover notice.
Is Creek Waters on schedule?
Yes, on the figures so far. It was 81% built at the inspection of 3 August 2026, after 36 months of work. It needs only 1.4% a month from there to meet the planned date. The last stage usually goes slower, so an early finish is possible but not certain.
What should I check before accepting my Creek Waters flat?
Go through every room with the power and water on: air conditioning, taps and drains, windows and balcony doors, kitchen appliances and cupboards, floors and paint. Report every fault before you accept the keys. We do the flat inspection for you and check the repairs afterwards.
How much do I pay at the Creek Waters handover?
If you are on Emaar’s 10/80/10 plan, the last 10% of what the flat costs you is due at handover, and nothing after the keys. On top come Emaar’s fees, the first service charge paid in advance, a refundable DEWA deposit of AED 2,000, a cooling deposit and the title deed fee.
What will the Creek Waters service charge be?
Emaar has not published it. Its finished towers in Dubai Creek Harbour charge between AED 17 and 23 per sq ft a year, and the middle is about AED 19. Put your own size into the calculator above for a figure in dirhams. District cooling is billed apart.
What rent can a Creek Waters one-bed get?
We estimate AED 105,000 to 130,000 a year, going by leases in The Cove II, Island Park II and Palace Residences North. The three differ quite a lot, and one of them is below our range, so plan with the lower figure or less. We have no estimate for larger flats yet.
Can Emaar hand over my Creek Waters flat while I am abroad?
Yes. We do it all in Emaar One and on site: the bill, the flat inspection, the DEWA and cooling accounts and the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
Creek Waters: from Emaar’s notice to a tenant in place
At Creek Waters we take the notice in Emaar One, check the bill and do the flat inspection. Then our interior design team furnishes the flat. We find a tenant on a yearly contract, and our property management looks after the flat and the tenant year after year.
What we do for your flat
- 01
The handover with Emaar.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Creek Waters
Write to us with your flat type. We send the next Creek Waters inspection when it is out, and a first estimate of your handover bill, at no cost.
On a computer? Scan to open WhatsApp on your phone, with the message ready.