Fairway Villas 2 handover date: 92% built, what happens next

Fairway Villas 2 is in its last months of work, and its planned date is only weeks away. We tell you when Emaar’s notice comes, and we can then take over the whole handover while you stay abroad.

BuiltChecked by the Land Department · 17 Aug 2026
92%builtDue Dec 2026
17 Aug 2026Last inspection31 Dec 2026Planned finish date
Villas at Fairway Villas 2 in Emaar South, the developer’s renderDeveloper’s render · Emaar

Handover date

Q4 2026

Emaar’s estimate. Your handover notice gives the date that counts.

Next step

The completion certificate

Then Emaar’s handover notice

Homes

176

3- and 4-bedroom villas on the golf course

Developer

Emaar

Emaar South

Where Fairway Villas 2 is now, and the steps to your keys

Fairway Villas 2 now, and the road to your keys

Fairway Villas 2 is almost finished, the furthest along of the Emaar South villa projects still being built. Only the finishing work remains before Emaar’s handover notice. We pass on every new inspection.

1 Jul 2023
✓

Work started

The date registered with the Land Department.

17 Aug 2026
✓

Last inspection

92% built.

Today

Finishing work is under way. The planned date registered with the Land Department is 31 December 2026, and Emaar also says Q4 2026.

To your keys
Next

New inspection results

We send you each one the day it appears. Progress over time →

100% and the completion certificate

After that, Emaar starts sending handover notices.

Handover notice

Emaar asks for the last payment and the fees, and tells you when the villa inspection and the key collection can be booked. We book both for you.

Snagging

We check the villa, the roof and the garden levels before you accept the keys, and send Emaar the list of faults.

Keys

We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.

After the keys

Furnishing

If you want it furnished, we design and furnish the villa so it is ready for a tenant.

Your garden

We design it, get Emaar’s approval and build it, so the villa is finished when a tenant moves in. Your garden →

Your first tenant

We advertise the villa once it is ready, find a tenant on a yearly contract and send the rent to you abroad.

Source: Dubai Land Department.

Progress over time

Fairway Villas 2: will it be ready on time?

Fairway Villas 2 has gone up faster than its planned date at the end of 2026 needs. The two lines compare the pace the villas have kept since work began with the pace still needed.

0%50%100%20232024202520262027Today92% at the last inspection, 17 Aug 2026Late 2026 · speed so farDec 2026 · registered0%50%100%20232024202520262027Today92% · 17 Aug 2026Late 2026Dec 2026

Source: Dubai Land Department

Speed so far

2.4% a month

92% in the 38 months from July 2023 to the last inspection

Needed for 31 December 2026

~2.0% a month

the remaining 8% in the 4 months from the last inspection to the planned date

What this means

The villas have gone up faster than the date needs, so the building work itself is unlikely to hold your keys back. After it, the completion certificate and Emaar’s notice still take some weeks. Plan for keys in the first months of the new year; sooner is possible.

Handover costs

Fairway Villas 2: the bill at handover

At the Fairway Villas 2 handover, the largest payment is the last instalment in your sales agreement. Around it come Emaar’s fees, the service charge in advance, the DEWA deposit and the title deed fee.

Last payment15% of the priceIf you are on Emaar’s 10/75/15 plan. Your sales agreement shows yours.
Emaar’s handover and admin feesEmaar doesn’t publish these
Service charge, paid in advanceShown on your bill
Electricity and water (DEWA)AED 4,000 deposit + about AED 130 fees
Title deedAbout AED 250–600
Snagging (checking the villa for faults)Quoted for your villa

Typical figures for 2026. Emaar’s bill has the exact amounts, and we check them with you line by line.

Service charge

Fairway Villas 2: what the service charge may be

Emaar has not set a service charge budget for Fairway Villas 2 yet, so this is an estimate. The rates below are paid in finished Emaar villa projects nearby, the closest guide until Fairway Villas 2 has its own.

Your yearly service charge

~AED 16,950

about AED 1,410 a month

Lowest nearbyAED 9,330Highest nearbyAED 21,580

Your size × the middle rate of the villa projects nearby. A Fairway Villas 2 three-bed is about 3,070 sq ft.

The same villa in each villa project nearby, a year

AED a yearper sq ft
Fairway VillasAED 9,3303.04
ParksideAED 14,3404.67
Fairway Villas 2yours, estimated~AED 16,9505.52
Golf LinksAED 19,5306.36
UrbanaAED 21,5807.03

Source: Dubai Land Department service charge index, via DXBinteract

Furnish or not?

Fairway Villas 2: furnished or empty for your tenant?

Fairway Villas 2 villas come empty, and you can let yours as it is or furnished. More than half are 3-Bed villas, so tenants will see many alike. Until Fairway Villas 3 is done, they will also see older villas nearby.

Fairway Villas 2’s homes by layout

Which is yours?

Most homes here are 3-beds: 96 of them.

3-Bed9655%
4-Bed8045%

Source: Dubai Land Department

A similar villa in another project, empty and furnished

A living room at Fairway Villas 2, furnished
A living room at Fairway Villas 2, empty
UnfurnishedFurnished‹ ›
  • ✓Stands out next to similar homes on rental websites
  • ✓Tenants see how they would live in it
  • ✓Ready to move into, for tenants who don’t want to buy furniture

What this means

When several villas look the same in the listings, furniture and interior design help yours look like a home. A furnished villa can also suit tenants who arrive in Dubai without furniture of their own.

We plan the interior of your Fairway Villas 2 villa around its rooms, furnish it after the keys and photograph it ready to let.

Furnish my property for me

Garden

Fairway Villas 2: turning the plot into a garden

We expect Fairway Villas 2 plots to come as bare sand, as at most new Dubai villas. Our landscaping turns yours into a finished garden: we design it, get Emaar’s approval, then build it.

Designed around how you will use it

Lawn and plantingchosen for the heat
Shade and seatinga pergola, an outdoor room
Garden lightingfor the evenings
Automatic irrigationit waters itself

The same garden, at the keys and finished

A garden at Fairway Villas 2, finished
The same garden at Fairway Villas 2, at the keys
At the keysFinished‹ ›

Whatever you plan for the house

Moving in yourself

You arrive to find a lawn, shade and lights already in place, with no work starting behind the house.

Finding a tenant

On a street of similar villas, a finished garden helps yours stand out to families.

Selling one day

A buyer sees a finished home, with no garden still to plan or pay for.

What this means

Emaar has to approve the plan before anything is dug or built, and it can make you remove work built without its approval. Getting the approval first means the garden is built only once.

Send us your Fairway Villas 2 plot number, and we come back with a first garden plan and what it would take to build.

Design my garden

Buildings around

Fairway Villas 2 and the other villa projects in Emaar South

Fairway Villas 2 is the furthest along of the Emaar South villa projects still being built. Fairway Villas and Greenview 3 nearby are already finished.

Already finished

✓Fairway Villas✓Greenview 3

Being built

Fairway Villas 2YoursDue Dec 2026
92%
Fairway Villas 372 homes
49%
Greenville 2148 homesDue Mar 2029
47%
Greenville140 homesDue Mar 2029
46%
Greens Point196 homesDue Mar 2029
43%
Greenway232 homes
39%
Green Ridge520 homesDue Dec 2028
36%
Golf Lane574 homes
30%

Source: Dubai Land Department

What this means

Fairway Villas 3 is the next closest, and it is less than half built. So for a good while, tenants will compare your villa with older finished villas such as those at Fairway Villas and Greenview 3, not with other new ones. Being the newest villa nearby can help you when you let.

The developer

Emaar handovers: how yours at Fairway Villas 2 will go

How Emaar hands over homes, and how many of its projects are past their date.

About Emaar

Emaar sends the notice, the bill and the booking for your villa through its Emaar One app. Fairway Villas 2 is one of the many Emaar projects being built, and few of those are past their dates.

Handover

How handover is booked

BookingEmaar One app or eservice.emaar.com
Home inspection and keysBooked through Emaar One
Bill, payments, documentsEmaar One
Phone800 36227 · +971 4 366 1688 from abroad

Emaar’s 270 projects in the Land Department records

  • Finished181
  • Being built, date still ahead yours71
  • Being built, past their date7
  • Being built, no finish date given11
Homes in finished projects59,776
Projects being built now89

Source: Dubai Land Department

What this means

Emaar’s record suggests your date is likely to hold, and no Emaar South villa project being built is further along. After the building work, what remains is mostly paperwork: the certificate, the notice and the bill. You make the payment, and we deal with the rest.

We deal with Emaar for your Fairway Villas 2 villa from the notice to the keys, while you stay at home.

Get my handover plan

Location

Where Fairway Villas 2 is, and what lies around it

Fairway Villas 2 is in Emaar South, a golf community in Dubai South, built around the Emaar South Golf Course. Expo City Dubai is next door, and Al Maktoum Airport is a short drive away.

By car

Expo City Dubai~10 min
Al Maktoum Airport (DWC)~12 min
Dubai Marina~30 min
Mall of the Emirates~35 min
Downtown Dubai~40 min

Around you

GolfEmaar South Golf Course
Next doorExpo City Dubai
AirportAl Maktoum International (DWC)
RoadsSheikh Mohammed Bin Zayed Road and Emirates Road

Questions

Fairway Villas 2: what owners ask

Something not here? Ask us on WhatsApp; we reply within 30 minutes.

When is the Fairway Villas 2 handover date?

Fairway Villas 2 is due on 31 December 2026. That is the planned date, the date registered with the Land Department, and Emaar also says Q4 2026. Keys follow once the villas reach 100% and have their completion certificate, and the date in your handover notice is the one that counts.

Is Fairway Villas 2 on schedule?

Yes, so far. Fairway Villas 2 has gone up at about 2.4% a month since work began, and about 2.0% a month is enough to reach the planned date. At that speed it would be finished around November 2026, although the last part of a build is often the slowest.

What should I check at my Fairway Villas 2 villa before I take the keys?

Check the roof and terraces for standing water, the AC on every floor, the door and window seals against sand, and the slope of the plot away from the walls. We carry out this villa inspection for you, send Emaar a list of faults with photos, and come back to check the repairs.

Will my Fairway Villas 2 garden be finished at handover?

We do not expect so. Like most new villas in Dubai, Fairway Villas 2 plots should come as bare sand. We can design a garden for your plot, have Emaar approve it and then build it. A pergola needs the same approval first.

How much do I pay at the Fairway Villas 2 handover?

If you are on Emaar’s 10/75/15 plan, the last 15% falls due at the Fairway Villas 2 handover. You also pay Emaar’s fees, the service charge in advance, a refundable DEWA deposit of AED 4,000 and the title deed fee. Your sales agreement shows your plan, and we can work out an early estimate for your villa.

What will the Fairway Villas 2 service charge be?

Emaar has not published the Fairway Villas 2 service charge yet. In its finished villa projects nearby, owners pay from about AED 3 to 7 per sq ft a year. At the middle rate of those projects, a three-bed of about 3,070 sq ft would cost about AED 16,950 a year.

Can I do the Fairway Villas 2 handover from abroad?

Yes. We act for you: we check Emaar’s bill, carry out the villa inspection, put DEWA in your name and collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.

Our service

Fairway Villas 2: from Emaar’s notice to your first tenant

We look after your Fairway Villas 2 villa from Emaar’s notice on: we check the bill against your plan, inspect the roof, the terraces and each floor before the keys, then build the garden. After that come interior design, furnishing, a tenant and property management year after year.

Illustrative photo

What we do for your villa

  1. 01

    The handover with Emaar.

  2. 02

    The inspection for faults.

  3. 03

    Design and furnishing.

  4. 04

    A tenant, and the rent sent to you.

  5. 05

    Looking after it year to year.

Free updates and a handover plan

Your handover plan for Fairway Villas 2

Tell us which villa is yours. We let you know the day Emaar’s notice is sent, with a first estimate of your handover bill, at no cost.

100+properties handledNo needto fly in30 minto reply, any time

Your unit

Keep me updated

On a computer? Scan to open WhatsApp on your phone, with the message ready.