In Majan · by True Future
High Best Tower by True Future handover date: now late
The planned date for High Best Tower passed on 1 November, and the last inspection on record is from May, so work has most likely moved on since. We watch for True Future’s notice and take each handover step off your hands.
Developer’s render · True FutureHandover date
Q4 2026The date listings give now. The registered one has passed.
Next step
The completion certificateThen True Future’s handover notice
Homes
841, 2 and 3 bedrooms, in two seven-floor buildings sold as one project; listings say the homes are sold furnished
Developer
True FutureMajan
Where High Best Tower is now, and the steps to your keys
Where High Best Tower stands, and each step to your keys
High Best Tower is further along than any other block being built in Majan, and six nearby buildings are already finished. We send you each new inspection of the two buildings as soon as it appears.
Work started
The start date on the Land Department register.
Last inspection
91% built.
Not finished yet. The planned date of 1 November 2026 has passed, and no handover notices have been reported so far.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, True Future starts sending handover notices.
Handover notice
True Future asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send True Future the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
High Best Tower completion date: is it moving fast enough?
The planned date has passed, so the chart measures High Best Tower against Q4 2026, the date most listings give. True Future has published no date of its own.
Source: Dubai Land Department
Speed so far
4.8% a month91% in the 19 months from November 2024 to the last inspection
Needed for the listings’ date
~1.3% a monththe remaining 9% in the 7 months from the last inspection to the end of December 2026
What this means
Its pace so far is well above what Q4 2026 needs, so the work itself may be close to done. The last few points of a build often take longer, and the last inspection is from May, so the next one tells you more than the chart. Keep the handover payment ready from now on.
Handover costs
High Best Tower handover costs to budget for
If you are on the payment plan most listings quote, the largest instalment is due at handover, and nothing after the keys. True Future’s fees, DEWA and the title deed fee come on top.
Typical figures for 2026. True Future’s bill has the exact amounts, and we check them with you line by line.
Snagging
Snagging at High Best Tower: what to check first
Snagging is the flat inspection between True Future’s notice and your signature for the keys, and the snagging report lists every fault for True Future to repair. In these two buildings, four checks matter most.
Furniture and kitchen appliances
Listings say the flats come furnished. We look over every piece of furniture for damage and switch on each kitchen appliance, so anything broken is repaired before you move in.
The smart-home controls
Listings describe smart controls for the lights, the cooling and security. We try each control and the app or panel behind it, room by room.
Bathrooms and bedrooms in two-beds
Two in three homes here are two-beds, from about 1,056 sq ft according to listings. We test every bathroom for drains and water pressure, and the cooling in each bedroom.
Top floor and roof edges
Each building has five floors of flats under a roof, listings say. On the top floor we look for damp in the ceilings and along the roof edges.
What this means
Faults written down, with photographs, before you sign for the keys are repaired before you move in. True Future repairs them at its own cost, and we return to check each repair.
From AED 1,599 we carry out the flat inspection at High Best Tower for you and send True Future the list of faults, each with a photograph.
Buildings around
High Best Tower and the other buildings in Majan
High Best Tower is the furthest along of the Majan blocks still being built, and six buildings around it are already finished.
Already finished
Being built
Source: Dubai Land Department
What this means
Only Sherena Residence 2 is near the same stage, so few new flats in Majan should reach tenants at the same moment. Tenants will compare yours mostly with finished buildings such as Tulip Oasis 10 and Celia Heights. A two-bed that is checked, repaired and ready soon after the keys has a head start.
The developer
True Future handovers: how they work, and the developer’s record
How True Future hands over homes, and how many of its projects are past their date.
About True Future
True Future will send each owner a handover notice once the building is ready. It has no finished project on the record yet. High Best Tower is the further along of its two projects; Future Residence was 0% built at its June 2026 inspection.
Handover
How handover is booked
True Future’s two projects in the Land Department records
- Finished0
- Being built, date still ahead1
- Being built, past their date yours1
- Being built, no finish date given0
Source: Dubai Land Department
What this means
With no finished building behind it, True Future’s record says little about your date, so the next inspection of High Best Tower is the better guide. From abroad, we answer True Future’s notice for you.
Write to us now and we will tell you when True Future’s notices for High Best Tower go out, and what yours will ask you to pay.
Location
Where High Best Tower is, and what is around it
High Best Tower is two low buildings in Majan, a short drive from Downtown Dubai; listings also place it in MBR City, District 11. Listings give each a basement, five floors of flats, a pool and a gym.
By car
Around you
Questions
High Best Tower: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the High Best Tower handover date?
The planned date for High Best Tower, the completion date registered with the Dubai Land Department, was 1 November 2026 and has passed. Most listings now give Q4 2026; True Future has published no date of its own. The two buildings were 91% built at the inspection of 19 May 2026. Your own date comes in True Future’s handover notice.
Is High Best Tower late?
Yes, High Best Tower is past its planned date of 1 November 2026. Since work began it has moved about 4.8% a month, and it needs only about 1.3% a month to finish by the end of December 2026, the date listings give. That looks within reach, but the last inspection was in May, so only a new one shows where it stands.
What should I check in my High Best Tower flat before accepting it?
The furniture and every kitchen appliance, the smart-home controls, each bathroom and the cooling in each bedroom, and damp in the top-floor ceilings. Every fault you list in writing before you sign for the keys is True Future’s to repair.
How much do I pay at the High Best Tower handover?
If you are on the 30/70 plan most listings quote, 70% is due at handover and nothing after the keys. True Future’s fees, the service charge in advance, the DEWA deposit and the title deed fee come on top. Your sales agreement shows your plan.
Can I take over my High Best Tower flat from abroad?
Yes. We read True Future’s notice and bill, carry out the flat inspection, set up DEWA in your name and pick up the keys on your behalf. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
Everything from True Future’s first notice to a tenant in your flat
At High Best Tower we book your flat inspection as soon as the notice comes, check True Future’s bill against your plan, and test the furniture, the appliances and the smart controls before the keys. After the keys come interior design, a yearly tenant and our property management.
What we do for your flat
- 01
The handover with True Future.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for High Best Tower
Leave your details. We write after each new inspection of High Best Tower and tell you what it means for your handover notice and your payment.
On a computer? Scan to open WhatsApp on your phone, with the message ready.