In Palm Jumeirah · by Taraf

Almost finished · past its date

Luce, Palm Jumeirah handover date: 98% built, what happens next

Luce is almost finished, but its planned date has passed and Taraf has not named a new one. We watch the Land Department record for you, and when Taraf’s notice comes we check the bill, inspect the flat and collect the keys.

BuiltChecked by the Land Department · 31 Aug 2026
98%builtPast its planned date
31 Dec 2025Planned finish date31 Aug 2026Last inspection
Luce on Palm Jumeirah at sunset, seen from the water: curved white balconies with timber accents, palms and beach loungers in front, the developer’s renderDeveloper’s render · Taraf

Handover date

Not set

Your handover notice gives the date that counts.

Next step

The completion certificate

Then Taraf’s handover notice

Homes

38

2 to 4 bedrooms, in one low building

Developer

Taraf

Palm Jumeirah

Where Luce is now, and the steps to your keys

Luce, Palm Jumeirah construction update, and every step to your keys

Of all the buildings going up on Palm Jumeirah, Luce is the closest to its keys. What is left is the completion certificate, then Taraf’s notice to each owner. We send you each new inspection when it is published.

19 Sep 2023
✓

Work started

Taraf announced the groundbreaking, and the press reported it on this date. The Land Department record gives no start date.

31 Dec 2025
✓

Planned date

The completion date registered with the Land Department, now passed.

31 Aug 2026
✓

Last inspection

98% built.

Today

Almost built, and past its planned date. Taraf has given no new date, so the completion certificate is the next step to watch.

To your keys
Next

New inspection results

We send you each one the day it appears.

100% and the completion certificate

After that, Taraf starts sending handover notices.

Handover notice

Taraf asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.

Snagging

We check the flat before you accept the keys, and send Taraf the list of faults.

Keys

We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.

After the keys

Furnishing

If you want it furnished, we design and furnish the flat so it is ready for a tenant.

Your first tenant

We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.

Sources: Dubai Land Department; Taraf (groundbreaking).

Handover costs

Luce, Palm Jumeirah handover costs to budget for

At Luce the largest payment at handover is the part of your plan due then. The plans quoted differ, so your sales agreement sets it. Taraf’s fees and the advance service charge come with it.

Last paymentAs in your sales agreementPlans quoted for Luce differ. If you are on the plan most listings give (10% at booking, 50% during construction), 40% is due at handover; if you are on the plan two others give (20% at booking), it is 80%. Your sales agreement shows yours.
Taraf’s handover and admin feesTaraf doesn’t publish these
Service charge, paid in advanceShown on your bill
Electricity and water (DEWA)AED 2,000 deposit + about AED 130 fees
Air conditioning (cooling)The deposit depends on the company
Title deedAbout AED 250–600
Snagging (checking the flat for faults)From AED 1,599

Typical figures for 2026. Taraf’s bill has the exact amounts, and we check them with you line by line.

Snagging

Snagging at Luce, Palm Jumeirah: what to check first

Snagging is the check of your flat for faults after Taraf’s notice and before you sign for the keys. Taraf must repair every fault in the snagging report. At Luce, four checks matter most.

01

Salt air on the beach

Luce stands on the beach of the East Crescent. Salt reaches balcony rails, door handles, window frames and outdoor lights first, so we look for rust, stains and loose fixings on each.

02

Many rooms in each home

Eight in ten homes here have three or four bedrooms. That means more bathrooms, more air conditioning units and more doors, and we test every one, room by room.

03

Stone, joinery and wardrobes

These homes were sold as luxury flats. We check the stone for chips and cracks, the joinery and fitted wardrobes for gaps and poor joints, and that every door and drawer closes properly.

04

Basement parking and storerooms

Press reports give Luce two basement floors, below a building that stands on the beach. We walk your parking bay and storeroom and look for damp, water marks and blocked drains.

What this means

Put every fault in writing, with a photograph, and send it to Taraf before you accept the keys. Taraf then repairs it at its own cost, and we check the repairs before you sign.

From AED 1,599 we carry out the flat inspection at Luce while you are abroad, and send Taraf the full list with a photograph of every fault.

Book my snagging

Furnish or not?

Luce, Palm Jumeirah: furnish yours, or let it empty?

Most homes at Luce are three-bedroom flats, and the other buildings going up on the Palm are further behind on the record. Your flat will be compared with finished homes in buildings such as Six Senses Residences The Palm and Ellington Beach House.

Luce’s homes by layout

Which is yours?

Most homes here are 3-beds: 21 of them.

2-Bed718%
3-Bed2155%
4-Bed1026%

Source: Dubai Land Department

A similar flat in another building, empty and furnished

A living room at Ellington House II, Dubai Hills Estate, furnished
A living room at Ellington House II, Dubai Hills Estate, empty
UnfurnishedFurnished‹ ›
  • ✓Stands out next to similar flats on rental websites
  • ✓Tenants see how they would live in it
  • ✓Ready to move into, for tenants who don’t want to buy furniture

What this means

Tenants looking at a large home by the beach often want to move straight in. Interior design and good furniture help them picture living there, and a furnished flat can be shown as soon as it is done.

Tell us your layout and floor. We send a furnishing plan with its cost and the rent it may bring, ready to start once you have the keys.

Furnish my property for me

Buildings around

Luce and the buildings around it on Palm Jumeirah

Luce leads the buildings still going up on Palm Jumeirah. The list shows the eight furthest along, each with its developer, and the finished buildings tenants will also look at.

Already finished

✓Six Senses Residences The Palm✓Serenia Living✓Eome✓Ellington Beach House✓The Royal Atlantis✓One at Palm Jumeirah

Being built

LuceYoursTarafWas due Dec 2025
98%
Palm Beach Towers 1278 homesNakheelDue Dec 2026
83%
Palm Beach Towers 2319 homesNakheelDue Dec 2026
82%
Ocean House95 homesEllington
81%
One Crescent25 homesAHSWas due Mar 2026
80%
Palm Beach Towers 3457 homesNakheelDue Dec 2026
74%
Orla by Omniyat90 homesOmniyatDue Dec 2026
70%
SLS Residences113 homesRoya LifestyleWas due Jul 2026
60%

Source: Dubai Land Department

What this means

Every other building going up on the Palm is further behind on the record. Tenants will compare Luce mainly with finished homes such as Six Senses Residences The Palm and Serenia Living, so a clean, checked and well photographed flat matters.

The developer

Taraf handovers: how they work and who to call

How Taraf hands over homes, and how many of its projects are past their date.

About Taraf

Taraf sends each owner a handover notice when Luce is complete. Its chief executive called Luce the company’s “first iconic property”, and its homes sold within hours of the launch, Taraf says. With one finished project on the record, this is among its first handovers.

Handover

How handover is booked

BookingWith Taraf, once the handover notice arrives
Flat inspection and keysWhere the handover notice says
Bill, payments, documentsFrom Taraf, with the notice

Taraf’s seven projects in the Land Department records

  • Finished1
  • Being built, date still ahead2
  • Being built, past their date yours2
  • Being built, no finish date given2
Homes in finished projects94
Projects being built now6

Source: Dubai Land Department

What this means

Of Taraf’s projects still being built, Luce is one of two past its planned date. On the Palm, it is ahead of every building going up, so the notice could come with little warning. We answer it and check the bill for you.

Write to us now and we tell you when Taraf’s notices for Luce start going out, and what yours will ask you to pay.

Get my handover plan

Location

Luce, Palm Jumeirah location, and what is around it

Luce is on the East Crescent of Palm Jumeirah, the outer ring of the island, with the beach in front of it. Hotels and resorts line the crescent, and Dubai Marina is a short drive back along the Palm.

By car

Dubai Marina~20 min
Downtown Dubai~25 min
Dubai International (DXB)~35 min

Around you

AreaThe East Crescent of Palm Jumeirah, on the beach
BeachPrivate access to the beach, according to Taraf
On the PalmPalm Beach Towers, Ocean House and other new buildings going up

Questions

Luce: what owners ask

Something not here? Ask us on WhatsApp; we reply within 30 minutes.

When is the Luce Palm Jumeirah handover date?

No new handover date has been set for Luce. The planned date, the completion date registered with the Dubai Land Department, was 31 December 2025 and has passed. The inspection of 31 August 2026 found Luce 98% built. Your own date will come in Taraf’s handover notice.

Is Luce on Palm Jumeirah late?

Yes. Luce is past its planned date of 31 December 2025, and no newer date has been given. In the 35 months from the groundbreaking in September 2023 to the inspection at the end of August 2026, it went up about 2.8% a month. The next inspection will show whether the last 2% is done.

What should I check in my Luce flat before the keys?

Start with what the sea air reaches first: balcony rails, handles, window frames and outdoor lights. Then the stone and joinery, each bathroom and air conditioning unit, and your basement parking bay. Anything you put in writing before signing is Taraf’s to put right.

How much do I pay at the Luce handover?

At Luce it depends on your plan, and the ones quoted differ. If you are on the plan most listings give, 40% is due at handover; if you are on the plan two others give, it is 80%. On top of that come Taraf’s own fees, the service charge in advance, the DEWA deposit and the title deed fee.

Can I take over my Luce flat from abroad?

Yes. We go through Taraf’s bill line by line, carry out the flat inspection, set up DEWA in your name and then pick up the keys on your behalf. If the developer requires a power of attorney, we arrange it with you remotely.

Our service

Everything from Taraf’s first email to a finished home

At Luce we answer Taraf’s notice, check the bill against your own plan, and check the fittings that salt air on a beach site wears first. Then we offer interior design for a large home, find a tenant on a yearly contract and take on property management.

Illustrative photo

What we do for your flat

  1. 01

    The handover with Taraf.

  2. 02

    The inspection for faults.

  3. 03

    Design and furnishing.

  4. 04

    A tenant, and the rent sent to you.

  5. 05

    Looking after it year to year.

Free updates and a handover plan

Your handover plan for Luce

Leave your details. We write when a new inspection of Luce appears, and tell you what it means for your handover notice.

100+properties handledNo needto fly in30 minto reply, any time

Your unit

Keep me updated

On a computer? Scan to open WhatsApp on your phone, with the message ready.