In Nad Al Hamar · by Myra
Myra Onyx by Myra handover date: where it stands now
The planned date for Myra Onyx passed in September, and Myra has published no new date. Listings now give Q4 2026. When Myra’s notice comes, we take each handover step off your hands, from the flat inspection to the keys.
Developer’s render · MyraHandover date
Q4 2026The date listings give now. The registered one has passed.
Next step
The completion certificateThen Myra’s handover notice
Homes
60one-bed and two-bed flats in one 13-floor building; listings sell many of them with a study
Developer
MyraNad Al Hamar
Where Myra Onyx is now, and the steps to your keys
Myra Onyx today, and each step to your keys
Myra Onyx is well along but not finished, and no other building in Nad Al Hamar is on the Land Department record to compare it with. We send you each new inspection on the day it appears.
Work started
The date registered with the Land Department.
Planned date
The completion date registered with the Land Department, now passed.
Last inspection
86% built.
Not finished yet. The planned date of 12 September 2026 has passed, and no handover notices are known so far.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Myra starts sending handover notices.
Handover notice
Myra asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Myra the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
Myra Onyx completion: is it going fast enough?
The planned date has passed, so the chart compares the speed of Myra Onyx since work started with the speed it needs for Q4 2026, the date listings give. Myra has published no date itself.
Source: Dubai Land Department
Speed so far
3.4% a month86% in the 25 months from September 2024 to the last inspection
Needed for the listings’ date
~4.7% a monththe remaining 14% in the 3 months from the last inspection to the end of December 2026
What this means
So far the building has gone up slower than it needs to for Q4 2026, so the keys may well come later. Keep the handover money ready either way, and do not plan a tenant around Q4 2026. Myra’s notice sets your own date.
Handover costs
What you pay at the Myra Onyx handover
If you are on the payment plan most listings quote, the instalment at handover is the largest line, with nothing due after the keys. Myra’s fees, the service charge and DEWA come with it.
Typical figures for 2026. Myra’s bill has the exact amounts, and we check them with you line by line.
Snagging
Snagging at Myra Onyx: four checks first
Snagging is the flat inspection between Myra’s notice and your signature for the keys. Every fault you list in that time is Myra’s to repair. In this building, four checks matter most.
Before the large handover payment
If you are on the plan most listings quote, 80% falls due at handover. We aim to finish the flat inspection and list the faults before that payment is made.
The study, checked like a bedroom
Two in three homes are two-beds, and listings sell many flats with a study. We test the study’s door, light, sockets and cooling as we do in each bedroom.
Smart controls and kitchen appliances
Listings describe smart-home controls and fitted kitchen appliances. We switch on every appliance and try each panel and the phone app, so any fault goes on the list.
Top floor and wet areas
The building has 13 floors on the record, and listings mention a pool. We look for damp in the top-floor ceilings and around any wet areas above a flat.
What this means
Each fault needs to be written down, with a photograph, before you sign for the keys. Myra repairs what is listed at its own cost, and we check each repair before you accept the flat.
From AED 1,599 we carry out the flat inspection at Myra Onyx for you and send Myra a snagging report, each fault with a photograph.
Furnish or not?
Furnish your Myra Onyx flat, or let it empty?
Most homes at Myra Onyx are two-beds, and listings sell many with a study. With only 60 flats in the building, tenants will compare yours mostly with flats in other buildings nearby, in the east of Dubai.
Myra Onyx’s homes by layout
Which is yours?
Most homes here are 2-beds: 40 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
Interior design shows a tenant what a flat with a study can be: a home office, a nursery or a guest room. Set up that way, a new flat stands out on rental websites and can let sooner.
Send us your layout. You get a furnishing proposal for your Myra Onyx flat, with its cost and the rent to expect.
The developer
Myra handovers: how they work, and Myra’s record
How Myra hands over homes, and how many of its projects are past their date.
About Myra
Myra will send each owner a handover notice. Its four finished buildings, all in Jumeirah Village Circle, hold 649 homes. Myra Onyx is its only project being built, and its first in Nad Al Hamar.
Handover
How handover is booked
Myra’s five projects in the Land Department records
- Finished4
- Being built, date still ahead0
- Being built, past their date yours1
- Being built, no finish date given0
Source: Dubai Land Department
What this means
Myra has finished four buildings before, so a handover is not new to it, but this project is past its planned date and Myra has given no new one. The notice may come with little warning. From abroad, we answer Myra’s notice for you.
Write to us now and we will tell you when Myra’s notices for Myra Onyx go out, and what yours will ask you to pay.
Location
Where Myra Onyx is, and what is around it
Myra Onyx stands in Nad Al Hamar, the part listings call Nad Al Hamar Gardens, in the east of Dubai near Mirdif and the airport. It is one 13-floor building, and listings add a pool and a gym.
By car
Around you
Questions
Myra Onyx: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Myra Onyx handover date?
The planned date, the completion date registered with the Dubai Land Department, was 12 September 2026 and has passed. Myra has published no new date; most recent listings give Q4 2026. The building was 86% built at the inspection of 9 October 2026. The notice Myra sends you will set your own date.
Is Myra Onyx late?
Yes, it is past its planned date. Since work started it has gone up at about 3.4% a month, and it needs about 4.7% a month to finish by the end of December 2026, the date listings give. So that date looks hard to meet. Only a new inspection will show the pace now.
What should I check in my Myra Onyx flat before accepting it?
At Myra Onyx, check the study as well as the bedrooms, the smart-home panels and app, every kitchen appliance, and damp in the top-floor ceilings. Every fault you list in writing before you sign for the keys is Myra’s to repair.
How much do I pay at the Myra Onyx handover?
If you are on the 20/80 plan most listings quote, 80% is due at handover and nothing after the keys. Myra’s fees, the service charge in advance, the DEWA deposit and the title deed fee come on top. Your sales agreement shows your own plan.
Can I take over my Myra Onyx flat from abroad?
Yes. We read Myra’s notice and bill, carry out the flat inspection, set up DEWA in your name and pick up the keys on your behalf. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Myra’s notice to a tenant in your Myra Onyx flat
At Myra Onyx we book your flat inspection once the notice comes, check Myra’s bill before the large handover payment, and test the study and smart controls. After the keys come interior design for the study and the living room, a tenant on a yearly lease, and property management.
What we do for your flat
- 01
The handover with Myra.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Myra Onyx
Leave your details. We write after each new inspection of Myra Onyx and tell you what it means for your notice and your handover payment.
On a computer? Scan to open WhatsApp on your phone, with the message ready.