Nautica 2 by Select Group: handover date and next steps
The Land Department has no planned date for Nautica 2, so the only date is Select Group’s own, the end of 2026. The tower is in its last stretch. We follow each new inspection and prepare your handover while you are abroad.
Developer’s render · Select GroupHandover date
Q4 2026Select Group’s estimate. Your handover notice gives the date that counts.
Next step
The completion certificateThen Select Group’s handover notice
Homes
3281 and 2 bedrooms, in a 49-floor tower
Developer
Select GroupDubai Maritime City
Where Nautica 2 is now, and the steps to your keys
Nautica 2 today, and every step to your keys
Nautica 2 is almost finished: level with its twin and Aria by Beyond, the furthest along of the towers going up in Dubai Maritime City. We send you each new inspection the day it is recorded.
Sales opened
Select Group launched Nautica, two identical towers, Nautica One and Nautica Two. The Land Department record gives no start date for the building work.
Last inspection
85% built.
In the last stretch of building. There is no planned date on the record; Select Group’s own target is the end of 2026.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Select Group starts sending handover notices.
Handover notice
Select Group asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Select Group the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
Nautica 2 completion date: is it moving fast enough?
With no planned date on the record, the chart measures Nautica 2 against Select Group’s own end of 2026. Its line starts at the 2023 launch: the record has no start date for the work.
Source: Dubai Land Department
Speed so far
2.4% a month85% in the 35 months from the start of sales in September 2023 to the last inspection
Needed for Select Group’s estimate
~3.8% a monththe remaining 15% in the 4 months from the last inspection to the end of 2026
What this means
So far Nautica 2 has gone up at a slower speed than Select Group’s date now needs. At that pace it would be complete around March 2027, though the count starts at the launch, before building began. Plan for early 2027 rather than December, and keep the money for handover ready either way.
Handover costs
What you pay Select Group at the Nautica 2 handover
If you are on the Select Group payment plan most listings quote for Nautica 2, the last instalment, due at handover, is your largest payment. Fees and deposits come on the same bill.
Typical figures for 2026. Select Group’s bill has the exact amounts, and we check them with you line by line.
Snagging
Snagging at Nautica 2: what to check first
Snagging is checking your Nautica 2 flat for faults before you accept the keys. Every fault you report in writing before you sign is Select Group’s to repair. These four checks come first.
Windows high up the tower
Nautica 2 rises 49 floors beside the water. Wind and dust find any weak seal up there, so we close each window and balcony door and look for gaps and stains.
Salt air on metal parts
The tower stands by the sea at Port Rashid. We look at balcony rails, door handles and the outside parts of the air conditioning for early rust and pitting.
Book your date early
Nautica One next door is at the same stage, so the owners of two towers may ask for flat inspections in the same weeks. We ask for your date the day the notice arrives.
Faults shared by similar flats
Three in four homes here are one-beds. When we find a fault in one flat, we look for it in yours too, so a common fault is not missed.
What this means
Send Select Group every fault in writing, with photographs, before you accept the keys. Then the repairs are its to make, at its cost, and we check each one before you sign.
From AED 1,599 we do the flat inspection at Nautica 2 for you and send Select Group the snagging report, with a photograph of each fault.
Furnish or not?
Furnish your Nautica 2 flat, or let it empty?
Most homes in Nautica 2 are one-beds, and its twin tower and Aria by Beyond are at the same stage. Tenants will be able to choose between hundreds of new flats at once.
Nautica 2’s homes by layout
Which is yours?
Most homes here are 1-beds: 246 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
When the flats around yours are just as new, interior design and good furniture are what set yours apart. A furnished flat is easier to show from photographs, and tenants can move straight in.
Send us your flat number. We reply with a furnishing proposal, its cost and the rent it should bring, so tenants can move in soon after the keys.
Buildings around
Nautica 2 and the towers around it in Dubai Maritime City
Nautica 2 is one of about ten towers going up in Dubai Maritime City, near finished buildings such as The Anwa, Riva Residence, and Seagate and Sunridge at Mina Rashid.
Already finished
Being built
Source: Dubai Land Department
What this means
Nautica 2, Nautica One and Aria by Beyond are at the same stage, so about 800 new flats, yours included, could reach tenants within a few months. If you plan to let, look for your tenant as soon as you have the keys, before the twin tower fills.
The developer
Select Group handovers: how they work and who to call
How Select Group hands over homes, and how many of its projects are past their date.
About Select Group
When a tower is ready, Select Group sends each owner a handover notice with the bill. On the record, none of its towers being built has passed a planned date, but three, Nautica 2 and its twin among them, have no planned date at all.
Handover
How handover is booked
Select Group’s 19 projects in the Land Department records
- Finished14
- Being built, date still ahead2
- Being built, past their date0
- Being built, no finish date given3
Source: Dubai Land Department
What this means
Select Group’s finished projects include Marina Gate and the Peninsula towers in Business Bay. Nautica 2 is among the furthest along in Dubai Maritime City, and the notice could come within months. While you are abroad, we answer it and deal with Select Group for you.
Write to us now: we will tell you what Select Group’s notice will ask of you, and we watch the Land Department record until your tower is complete.
Location
Nautica 2 location, and what is around it
Nautica 2 stands on the waterfront of Dubai Maritime City, beside Port Rashid and Mina Rashid, with views over the Gulf. Sheikh Zayed Road, Downtown and the airport are a short drive away.
By car
Around you
Questions
Nautica 2: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Nautica 2 by Select Group handover date?
Select Group’s own date for the Nautica 2 handover is Q4 2026. There is no planned date, meaning no date registered with the Land Department. The tower was 85% built at the inspection of 3 September 2026. Your own date comes in Select Group’s handover notice.
Is Nautica 2 on time?
Nautica 2 is behind Select Group’s date. Counted from the launch, it has been built at about 2.4% a month, and it needs about 3.8% a month to finish by the end of 2026. At its pace so far it would be complete around March 2027.
What should I check in my Nautica 2 flat before accepting it?
At Nautica 2, check the windows and balcony doors (above all on high floors), metal parts exposed to the sea air, the air conditioning in each room, and every tap and drain. Select Group repairs every fault you list in writing before you sign for the keys.
How much do I pay at the Nautica 2 handover?
At the Nautica 2 handover you pay the last instalment of your plan. If you are on Select Group’s 40/60 plan, the one most listings quote, that is 60% of what your flat cost. Select Group’s fees, the service charge in advance and the DEWA deposit are added to it.
Can I take over my Nautica 2 flat from abroad?
Yes. We check Select Group’s bill, do the flat inspection, open the DEWA account in your name and collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Select Group’s notice to a tenant in your Nautica 2 flat
At Nautica 2 we ask for your flat inspection date before the twin tower’s owners book theirs, check Select Group’s bill for the large final payment, and look at every window and metal fitting. After the keys come interior design, a tenant on a one-year lease and property management.
What we do for your flat
- 01
The handover with Select Group.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Nautica 2
Leave your details. We tell you where Nautica 2 stands against Select Group’s date, and write again after each new inspection.
On a computer? Scan to open WhatsApp on your phone, with the message ready.