In Dubai Hills Estate · by Emaar
Palace Residences, Dubai Hills Estate handover date and construction status
The planned date for Palace Residences is still well ahead. The last inspection is five months old, so the towers have most likely moved on since. We read every new one and tell you what it changes.
Developer’s render · EmaarHandover date
Apr 2028The registered completion date. Your handover notice gives the date that counts.
Next step
A new inspectionThen the completion certificate and Emaar’s notice
Homes
9621 to 3 bedrooms, in five towers of 22 to 26 floors and a two-floor row of townhouses
Developer
EmaarDubai Hills Estate
Where Palace Residences is now, and the steps to your keys
Palace Residences construction update, and every step to your keys
Palace Residences is 10th of the 13 Dubai Hills Estate buildings well under way, and further from its keys than most of them. Golf Grand and Elvira nearby were finished this year. We send you each new inspection.
Work started
The date registered with the Land Department.
Last inspection
51% built.
About half built. The planned date, 30 April 2028, is still ahead.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Emaar starts sending handover notices.
Handover notice
Emaar asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Emaar the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
Palace Residences completion date: is it moving fast enough?
Palace Residences against its planned date: the speed of the work so far, and the speed that date needs. We count from the work start on the Land Department record.
Source: Dubai Land Department
Speed so far
1.9% a month51% in the 27 months from March 2024 to the last inspection
Needed for 30 April 2028
~2.2% a monththe remaining 49% in the 22 months from the last inspection to the planned date
What this means
The towers are moving a little slower than the planned date asks, though the gap is small and the last reading is old. The final floors and the finishing often take longer. Plan around the planned date, expect it could slip by a few months, and wait for Emaar’s notice before booking flights.
Buildings around
Palace Residences among the Dubai Hills Estate buildings going up
Dubai Hills Estate has many buildings going up at once. The list gives those well under way, with their planned dates, and the Emaar buildings finished nearby.
Already finished
Being built
Source: Dubai Land Department
What this means
Park Lane, Parkland, Soho The Berkeley and Vida Residences Club Point are at much the same stage, and together with Palace they hold about 2,800 homes. If they reach their keys close together, many owners will look for tenants at once. A flat that is ready and well shown will let first.
What it earns
Palace Residences rent, and what it earns
No one rents at Palace Residences yet. Golf Grand and Elvira, Emaar towers in Dubai Hills Estate finished this year, already have registered leases, and they give a starting point for a one-bed here.
Expected rent for your flat type
AED 85k–105k a year
Key Homes rent estimate
We took the first one-bed leases that the Land Department registered at Golf Grand and Elvira. Both are new Emaar flats of about the same size in this community. Their rate per sq ft, times a typical Palace one-bed, gives the middle of the range.
Our estimate.
Rent per sq ft a year, AED
Source: Dubai Land Department
What your flat could earn
Filled in for your layout, based on registered sales in Palace Residences, Sep 2025 to Jun 2026 and a typical size. Change them to your own figures.
How it adds up
Your yearly return (rental yield)
AED a year after costs, as a share of what you paid
What this means
Golf Grand and Elvira give almost the same rate, which helps. Palace is a branded building and its keys come later, so a tenant may pay a little more here, but rents can also move by then. When the first Palace leases are registered, we use those instead.
Tell us your tower, floor and layout. We work out what it could rent for and what is left for you after the yearly costs.
Service charge
Palace Residences service charge: what to expect
Emaar has not set the service charge for Palace Residences yet. Eight finished Emaar buildings in Dubai Hills Estate have Land Department rates, showing the band an Emaar tower here usually lands in. Owners pay it through Mollak.
Your yearly service charge
~AED 17,080
about AED 1,420 a month
Your size × the middle rate of the Emaar buildings nearby. A Palace Residences one-bed is about 747 sq ft.
The same flat in each Emaar building nearby, a year
Source: Dubai Land Department service charge index, via DXBinteract
Handover costs
Your bill at the Palace Residences handover
If you are on the plan most listings quote, the final instalment is by far the biggest line. Emaar’s fees, a first service charge payment and the DEWA and cooling deposits come with it.
Typical figures for 2026. Emaar’s bill has the exact amounts, and we check them with you line by line.
Furnish or not?
Palace Residences: furnish your flat or let it empty?
Close to half the homes at Palace Residences are one-beds, so many owners will be looking for the same kind of tenant. Park Lane, Parkland and other towers at the same stage add their own new flats to the choice.
Palace Residences’ homes by layout
Which is yours?
The most common home here is the 1-bed: 428 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
With so many new one-beds on offer, a tenant picks the flat that can be lived in from day one. Interior design that fits the Palace finishes, with furniture in place, helps yours let sooner.
Send us your layout and floor. You get a furnishing proposal with its cost, and the rent to expect with and without furniture.
While you wait
While Palace Residences is being built
Four things to do now, so your Palace Residences handover goes smoothly from abroad.
Keep instalments on time
If you are on Emaar’s 10/70/20 plan, most of your payments fall while the towers go up and a fifth at handover. A late instalment can hold up your handover, so keep the dates and the money ready.
Choose who checks your flat
Doors, tiles, cooling, drains and the fittings all need testing before you sign. We do the flat inspection, send Emaar a dated list with photographs and check each repair.
Live in it or let it
Decide now whether you will live in the flat or let it out. Furniture, photos and a tenant take weeks to arrange, so deciding early means the right work starts the day you get the keys.
Hear about each inspection
The planned date is 30 April 2028. We send you each new Land Department inspection of Palace Residences with a short note on what it means for your keys.
We can take your Palace Residences handover off your hands, from Emaar’s notice and bill to the flat inspection and the keys.
The developer
Emaar handovers: how they work and who to call
How Emaar hands over homes, and how many of its projects are past their date.
About Emaar
Emaar sends each owner a handover notice in the Emaar One app with the bill and the bookings for the flat inspection and the keys. It has 89 projects being built, and only 7 are past their planned date.
Handover
How handover is booked
Emaar’s 270 projects in the Land Department records
- Finished181
- Being built, date still ahead yours71
- Being built, past their date7
- Being built, no finish date given11
Source: Dubai Land Department
What this means
Emaar’s record on dates is strong. Golf Grand and Elvira here were finished this year, but Palace Residences is about half built, so its keys are not close yet. If you live abroad, we deal with Emaar One, the bill and the bookings for you.
Write to us now. We let you know the week Emaar starts sending notices for Palace Residences and what yours will ask for.
Location
Where Palace Residences is, in Dubai Hills Estate
Palace Residences is in Dubai Hills Estate, a green Emaar community laid out around a golf course, a short drive from Dubai Hills Mall, between Downtown Dubai and Dubai Marina.
By car
Around you
Questions
Palace Residences: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Palace Residences Dubai Hills handover date?
The planned date is 30 April 2028: the completion date Emaar registered with the Dubai Land Department. The towers were 51% built at the inspection of 16 June 2026. Your own date will come in Emaar’s handover notice.
Is Palace Residences Dubai Hills on time?
Palace Residences is close to its pace: since work started in March 2024, it has gone up at about 1.9% a month, and the planned date needs about 2.2%. The gap is small and the last inspection is months old, so plan around the planned date but allow for a slip of a few months.
What should I check in my Palace Residences flat before accepting it?
The doors, tiles and fittings, the cooling in every room, and each sink, shower and drain. Emaar repairs what you report in writing before you sign for the keys, so the flat inspection is booked as soon as your notice arrives. We book it for you.
How much do I pay at the Palace Residences handover?
If you are on Emaar’s 10/70/20 plan, 20% is due at handover. Emaar’s fees, a first service charge payment, the title deed fee and the DEWA and cooling deposits are on that bill too. Nothing is due after the keys.
What will the service charge be at Palace Residences?
Emaar has not set the Palace Residences service charge yet. Owners in eight finished Emaar buildings in Dubai Hills Estate pay about AED 16 to 30 per sq ft a year, with the middle near AED 23. A branded building may sit higher. The calculator works it out for your size.
How much rent could a Palace Residences one-bed earn?
A Palace Residences one-bed could rent for about AED 85,000 to 105,000 a year, going by the first registered leases at Golf Grand and Elvira, two Emaar towers nearby (about AED 126 per sq ft). Your floor and view decide where your flat falls. Two- and three-bed figures follow once there are leases to go by.
Can I take over my Palace Residences flat from abroad?
Yes, without flying in. We go through Emaar’s bill with you, do the flat inspection, open DEWA and cooling in your name and collect the keys for you. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Emaar’s notice to a tenant in your Palace flat
For Palace Residences we book your flat inspection in Emaar One the day the notice comes, check the bill, test the fittings and the cooling in every room, and collect the keys. Then come interior design, a yearly tenant and property management.
What we do for your flat
- 01
The handover with Emaar.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Palace Residences
Leave your details. After each new inspection of Palace Residences we write to tell you what it means for your notice and your keys.
On a computer? Scan to open WhatsApp on your phone, with the message ready.