Parkside Hills handover date and construction status
Parkside Hills is going up ahead of the pace its planned date needs, and the last inspection on record is from May, so it is probably further along today. We follow every new inspection and get your handover ready before Emaar’s notice comes.
Developer’s render · EmaarHandover date
Jun 2028The registered completion date. Your handover notice gives the date that counts.
Next step
A new inspectionThen the completion certificate and Emaar’s notice
Homes
3701 to 3 bedrooms, in one 21-floor tower
Developer
EmaarDubai Hills Estate
Where Parkside Hills is now, and the steps to your keys
Parkside Hills construction update, and each step to your keys
Parkside Hills is past the middle of the work. Some Dubai Hills Estate towers are further along, others started later, and several finished this year. We send you each new figure on the record.
Work started
The date registered with the Land Department.
Last inspection
68% built.
Still being built, with the planned date at the end of June 2028. The last inspection on record is from May 2026.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Emaar starts sending handover notices.
Handover notice
Emaar asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Emaar the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
Parkside Hills completion date: is it moving fast enough?
Parkside Hills has been built faster since work started than it needs to go from the last inspection to finish by the planned date.
Source: Dubai Land Department
Speed so far
2.3% a month68% in the 29 months from December 2023 to the last inspection
Needed for 30 June 2028
~1.2% a monththe remaining 32% in the 26 months from the last inspection to the planned date
What this means
The tower has been built faster than its planned date requires, so on the record so far it is on track. The work near the end often goes slower, and only Emaar’s notice fixes your own date. Plan your last payment and any tenant around the planned date, not earlier.
Buildings around
Parkside Hills and the other towers being built in Dubai Hills Estate
Parkside Hills is one of many towers going up in Dubai Hills Estate. The list shows the ones furthest along, and those already finished, four of them this year.
Already finished
Being built
Source: Dubai Land Department
What this means
Club Drive, Ellington House IV, Club Place and Golf Hillside stand at a similar stage on the record. If they finish close together, tenants will have many new flats nearby to choose from. A flat that is checked, furnished if you choose, and ready to show soon after the keys stands a better chance of being let early.
What it earns
Parkside Hills rent: what a flat could earn
No Parkside Hills flat has been let yet, so the estimate rests on the first leases signed in Golf Grand and Elvira, two finished Emaar buildings in Dubai Hills Estate.
Expected rent for your flat type
AED 75k–95k a year
Key Homes rent estimate
We took the rent per square foot of the first one-bed leases registered in Golf Grand and Elvira, both handed over this year by Emaar in the same community, and applied it to a typical Parkside Hills one-bed.
Our estimate.
Rent per sq ft a year, AED
Source: Dubai Land Department
What your flat could earn
Filled in for your layout, based on registered sales in Parkside Hills, Oct 2025 to Sep 2026 and a typical size. Change them to your own figures.
How it adds up
Your yearly return (rental yield)
AED a year after costs, as a share of what you paid
What this means
Treat this as a rough guide. Golf Grand and Elvira are finished now, while Parkside Hills comes later, and rents may have moved by then. Once the first tenants in the tower sign their leases, the record gives the real figure, and we update the estimate.
Write to us and we check the first registered leases in Parkside Hills as they come, and tell you what your layout could earn.
Service charge
Parkside Hills service charge: what to expect
Emaar has not published the Parkside Hills service charge yet. The list shows what owners pay in finished Emaar buildings in Dubai Hills Estate, a fair guide until the first bill comes.
Your yearly service charge
~AED 15,570
about AED 1,300 a month
Your size × the middle rate of the Emaar buildings nearby. A Parkside Hills one-bed is about 681 sq ft.
The same flat in each Emaar building nearby, a year
Source: Dubai Land Department service charge index, via DXBinteract
Handover costs
Parkside Hills handover costs to budget for
If you are on the plan listings quote for Emaar, your Parkside Hills handover bill is mainly the last instalment, with Emaar’s fees, the advance service charge and the DEWA and cooling deposits on top.
Typical figures for 2026. Emaar’s bill has the exact amounts, and we check them with you line by line.
Furnish or not?
Parkside Hills: furnish your flat or let it empty?
Two-beds are the largest group here, and towers such as Club Place and Golf Hillside are at a similar stage. A tenant may see many new flats at once, so how yours looks at the first viewing matters.
Parkside Hills’ homes by layout
Which is yours?
The most common home here is the 2-bed: 177 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
With several towers nearby at a similar stage, owners of furnished flats often find a tenant sooner. We plan the interior design before the keys, so the work can start the week you take over.
Write to us and we plan the interior design for your Parkside Hills layout before the keys, with a cost and a time you can count on.
While you wait
Parkside Hills: while you wait for the keys
Four things to do now, so your Parkside Hills handover goes smoothly from abroad.
Keep the last 10% ready
If you are on the 10/80/10 plan, a tenth of your purchase price is due with Emaar’s notice. Keep paying the instalments on time and hold every receipt, so the bill can be checked against them.
Choose who acts for you
At handover someone must check Emaar’s bill, test every bathroom and cooling unit, and look at the balcony doors and drains. We do all of it for owners who live abroad.
Decide: live in it or let it
A flat meant for a tenant is best furnished and ready to show soon after the keys. Make the choice now, and the work can start the week you take over.
Watch the inspections
The planned date is the end of June 2028. Each time the record shows a new figure we send it to you, and we tell you when the first handover notices for Parkside Hills go out.
Write to us now, and we prepare your Parkside Hills handover long before Emaar’s notice reaches you.
The developer
Emaar handovers: how they work and who to call
How Emaar hands over homes, and how many of its projects are past their date.
About Emaar
Emaar runs its handovers through the Emaar One app, where the notice, the bill and the dates for the flat inspection and keys arrive. Of 89 Emaar projects being built, 7 have passed their planned date. Parkside Hills is not among them.
Handover
How handover is booked
Emaar’s 270 projects in the Land Department records
- Finished181
- Being built, date still ahead yours71
- Being built, past their date7
- Being built, no finish date given11
Source: Dubai Land Department
What this means
Most of Emaar’s projects in the Land Department records are finished, and four of its buildings in Dubai Hills Estate were recorded finished this year. Parkside Hills is ahead of the pace its planned date needs. For owners abroad, we are the ones who talk to Emaar.
Write to us now and we tell you the week Emaar starts sending notices for Parkside Hills, and what your notice will ask for.
Location
Parkside Hills location, and what is around it
Parkside Hills stands in Dubai Hills Estate, beside Dubai Hills Park as listings place it, a short drive from Downtown Dubai. Dubai Hills Mall and the golf course are close, and Al Khail Road runs alongside.
By car
Around you
Questions
Parkside Hills: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Parkside Hills handover date?
Parkside Hills’ planned date, the completion date registered with the Dubai Land Department, is 30 June 2028. The tower was 68% built at the inspection of 7 May 2026. Emaar can hand over keys only once the completion certificate is issued, and the date for your own flat is set in its handover notice.
Is Parkside Hills on time?
On the record so far, yes. Parkside Hills has been built at about 2.3% a month since work started in December 2023, and needs only about 1.2% a month to finish by the planned date. The last inspection is from May, so a new one will show where it stands now.
What should I check in my Parkside Hills flat before accepting it?
Check every bathroom, shower and drain, the cooling in each room, the balcony doors and their seals, and the walls, floors and doors for marks. Put every fault in writing before you sign, so Emaar fixes it before you move in.
How much do I pay at the Parkside Hills handover?
If you are on the 10/80/10 plan, the last 10% of your Parkside Hills flat is due at handover, when Emaar’s notice asks for it. Emaar’s fees, the service charge in advance, the DEWA and cooling deposits and the title deed fee come on top. Nothing is due after the keys.
What will the Parkside Hills service charge be?
Emaar has not published the Parkside Hills service charge yet. In finished Emaar buildings in Dubai Hills Estate owners pay about AED 16 to 30 per sq ft a year, AED 22.87 in the middle. For a typical one-bed of 681 sq ft that is about AED 15,570 a year.
What rent could a Parkside Hills flat earn?
A Parkside Hills one-bed could earn about AED 75k to 95k a year, on the first one-bed leases in Golf Grand and Elvira, two finished Emaar buildings in Dubai Hills Estate. No flat in the tower has been let yet, so take it as a guide until the first leases give the real figure.
Can I take over my Parkside Hills flat from abroad?
Yes, you can take over your Parkside Hills flat without flying in. We go through Emaar’s bill line by line, carry out the flat inspection, set up DEWA and cooling in your name and pick up the keys for you. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Emaar’s notice to a tenant in your Parkside Hills flat
At Parkside Hills we book your flat inspection in Emaar One when the notice comes, check Emaar’s bill, test every bathroom, cooling unit and balcony, and collect the keys. After that come interior design, a tenant on a yearly lease, and property management for as long as you want it.
What we do for your flat
- 01
The handover with Emaar.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Parkside Hills
Leave your details. We write after each new inspection of Parkside Hills and tell you what it means for your notice and your keys.
On a computer? Scan to open WhatsApp on your phone, with the message ready.