In Arjan · by Samana

Almost finished · past its date

Samana Mykonos Signature handover date: what the record says

Samana Mykonos Signature passed its planned date in April. The date quoted as Samana’s is the end of this year, but at the speed so far the building needs several more months. We track it for you and have your handover ready for the notice.

BuiltChecked by the Land Department · 12 Oct 2026
86%builtPast its planned date
30 Apr 2026Planned finish date12 Oct 2026Last inspection
Samana Mykonos Signature in Arjan at dusk, a stepped white building with curved balconies above a row of shops, the developer’s renderDeveloper’s render · Samana

Handover date

Q4 2026

Samana’s latest date. The registered one has passed.

Next step

The completion certificate

Then Samana’s handover notice

Homes

276

Studios, 1 and 2 bedrooms, with shops below

Developer

Samana

Arjan

Where Mykonos Signature is now, and the steps to your keys

Where Mykonos Signature stands, and the steps to the keys

Around it in Arjan, nothing under construction is further along than Mykonos Signature, though three buildings are close behind. We forward each new inspection the day it is recorded.

Apr 2023
✓

Sales opened

Samana launched the building, styled like a superyacht, according to the press at the time. The Land Department record gives no start date for the building work.

30 Apr 2026
✓

Planned date

The completion date registered with the Land Department, now passed.

12 Oct 2026
✓

Last inspection

86% built.

Today

The last stage of building. The planned date is behind it, and the year-end date quoted as Samana’s looks too soon.

To your keys
Next

New inspection results

We send you each one the day it appears. Progress over time →

100% and the completion certificate

After that, Samana starts sending handover notices.

Handover notice

Samana asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.

Snagging

We check the flat before you accept the keys, and send Samana the list of faults.

Keys

We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.

After the keys

Furnishing

If you want it furnished, we design and furnish the flat so it is ready for a tenant.

Your first tenant

We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.

Source: Dubai Land Department.

Progress over time

Can Mykonos Signature be ready by the end of 2026?

The planned date has passed, so the chart holds the building up to the date quoted as Samana’s. The line starts at the launch in 2023, as the record shows no start of work.

0%50%100%202320242025202620272028Today86% at the last inspection, 12 Oct 2026Late 2026 · Samana’s estimateMid 2027 · speed so far0%50%100%202320252027Today86% · 12 Oct 2026Late 2026Mid 2027

Source: Dubai Land Department

Speed so far

2.0% a month

86% in the 42 months from the start of sales in April 2023 to the last inspection

Needed for Samana’s estimate

~4.7% a month

the remaining 14% in the 3 months from the last inspection to the end of December 2026

What this means

To finish this year the building would have to move more than twice as fast as its average so far. That is not likely. If it keeps its usual speed it would be complete in late spring, with the keys after that. Plan your payment and any travel for the middle of the year or later, not for December.

Handover costs

Your bill from Samana at Mykonos Signature

Your plan decides the bill. If you are on one that leaves most for handover, that is the main payment; on others part runs on after the keys. Fees and deposits come on top.

Last paymentAs in your sales agreementQuoted plans differ: some leave most of the amount for handover, others spread part of it over 32 months after the keys at 1% a month. Your sales agreement shows yours.
Samana’s handover and admin feesSamana doesn’t publish these
Service charge, paid in advanceShown on your bill
Electricity and water (DEWA)AED 2,000 deposit + about AED 130 fees
Air conditioning (cooling)The deposit depends on the company
Title deedAbout AED 250–600
Snagging (checking the flat for faults)From AED 1,599

Typical figures for 2026. Samana’s bill has the exact amounts, and we check them with you line by line.

Snagging

Your Mykonos Signature flat: what to inspect before the keys

You inspect after Samana’s notice and before you accept the keys, and Samana repairs the faults you report. In a building styled like a ship, with pools on the balconies, four points come first.

01

The balcony pool

Most one- and two-bed flats are listed with a pool on the balcony. We run the pump and filter and look closely at the tiles and the waterproofing under them.

02

Glass doors on curved balconies

The curved balconies have glass doors and rails. Their seals must keep pool water and rain out of the rooms, so we test them with water.

03

Life above the shops

The lower floors hold shops. In the flats just above, we listen for noise and check that no smells come up through shared ducts.

04

Finishing done in a hurry

A building behind its date is often finished in a rush, and that shows in paint, grout, joinery and silicone. We go over each surface, not only the obvious ones.

What this means

What you report before signing for the keys, in writing and with photographs, Samana must repair. We then check that work before you accept the flat.

From AED 1,599, we carry out the flat inspection at Mykonos Signature while you stay abroad, and the faults go to Samana in writing with photographs.

Book my snagging

Furnish or not?

Furnished or empty: letting a Mykonos Signature flat

Studios are the largest group here, and Aryene Greens, Rose Gardens 3 and Ashley Hills may bring their own new flats to Arjan at about the same time. Tenants will have plenty to compare.

Mykonos Signature’s homes by layout

Which is yours?

The most common home here is the studio: 128 of them.

Studio12846%
1-Bed11241%
2-Bed3613%

Source: Dubai Land Department

A similar flat in another building, empty and furnished

A living room in a finished Samana building, empty and then furnished, furnished
A living room in a finished Samana building, empty and then furnished, empty
UnfurnishedFurnished‹ ›
  • ✓Stands out next to similar flats on rental websites
  • ✓Tenants see how they would live in it
  • ✓Ready to move into, for tenants who don’t want to buy furniture

What this means

A balcony pool is what sets these flats apart, and it only shows if the rooms around it look good too. Interior design that ties the living room to the balcony makes the photographs, and the first viewings, count.

Send us your flat number and layout, and you get our furnishing proposal back with its cost and the rent it should bring.

Furnish my property for me

Buildings around

Mykonos Signature among the Arjan buildings going up

Six buildings are under way around it, all behind it. Six are finished, three by Samana: Samana Greens, Samana Hills and Samana Park Views.

Already finished

✓Joya Dorado Residences✓48 Parkside✓Marquis Elegance✓Samana Greens✓Samana Hills✓Samana Park Views

Being built

Mykonos SignatureYoursSamanaWas due Apr 2026
86%
Aryene Greens125 homesDiamond StarWas due Nov 2022
80%
Rose Gardens 349 homesCavaraWas due May 2026
76%
Ashley Hills616 homesTownxDue Mar 2027
74%
One Beverly389 homesHMBDue Dec 2026
73%
Samana Skyros441 homesSamanaWas due Apr 2026
71%
Elano by Oro24339 homesOro24Was due Oct 2025
70%

Source: Dubai Land Department

What this means

Aryene Greens, Rose Gardens 3 and Ashley Hills are not far behind, so about 1,100 new homes may come to Arjan within a few months of each other. If you plan to let, a flat shown soon after the keys meets fewer rivals than one that waits.

The developer

Samana’s handovers, and Mykonos Signature among its late buildings

How Samana hands over homes, and how many of its projects are past their date.

About Samana

Samana’s notice brings the bill and a time to book the keys. Six Samana projects are finished, Samana Hills and Samana Park Views among them nearby, and 49 are being built. Eight of the 49, this one included, are past their planned dates.

Handover

How handover is booked

BookingWith Samana, once the handover notice arrives
Flat inspection and keysAt the building, set out in the notice
Bill, payments, documentsFrom Samana, with the notice

Samana’s 55 projects in the Land Department records

  • Finished6
  • Being built, date still ahead33
  • Being built, past their date yours8
  • Being built, no finish date given8
Homes in finished projects981
Projects being built now49

Source: Dubai Land Department

What this means

Samana has eight late projects, and this building now looks late for the newer date too. Still, nothing under way around it in Arjan is further along. Owners abroad can leave the rest to us: we handle the notice, the bill and the keys.

Get in touch now. We keep track of Mykonos Signature and let you know when the notice is likely, so the payment is ready in time.

Get my handover plan

Location

Where Mykonos Signature is: Arjan, near the Miracle Garden

Mykonos Signature is in Arjan, a young area of mid-rise buildings off Umm Suqeim Street. Dubai Miracle Garden is a short drive, and Samana has finished buildings of its own close by, with Samana Skyros still going up.

By car

Dubai Miracle Garden~10 min
Mall of the Emirates~15 min
Downtown Dubai~25 min
Dubai International (DXB)~30 min

Around you

GardenDubai Miracle Garden, about 10 min
Samana nearbySamana Park Views, Samana Hills and Samana Skyros
RoadUmm Suqeim Street
AreaAl Barsha South Third

Questions

Mykonos Signature: what owners ask

Something not here? Ask us on WhatsApp; we reply within 30 minutes.

When is the Samana Mykonos Signature handover date?

Its planned date (the completion date registered with the Dubai Land Department) was 30 April 2026, and it has gone by. The date quoted as Samana’s own is Q4 2026. The building was 86% built when the Land Department checked it on 12 October 2026. Your handover notice from Samana will give the date that counts.

Is Samana Mykonos Signature delayed?

Yes. It has been built at about 2.0% a month since the launch, but would need 4.7% a month to finish by the end of December 2026. At its usual speed it would be complete around May 2027, and the keys would follow after that.

What should I check in a Mykonos Signature flat before the keys?

The balcony pool and its waterproofing, the seals of the glass doors on the curved balcony, noise and smells if you are just above the shops, and the quality of the finishing. Each fault must be with Samana in writing before you sign.

What is due at the Mykonos Signature handover?

It depends on your plan. If you are on one that leaves most of the amount for handover, that is due now. If you are on one that runs on after the keys, part is spread over 32 months at 1% a month. Samana’s fees, deposits for DEWA and the cooling, and the service charge in advance are added.

Can I take the keys to my Mykonos Signature flat while abroad?

Yes. We act for you: we check Samana’s bill, do the flat inspection with the pool, open DEWA in your name and collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.

Our service

From the notice to a tenant: your Mykonos Signature flat

For Mykonos Signature we check Samana’s bill against your plan, test the balcony pool and the glass doors, and look hard at finishing done under time pressure. After the keys, our interior design brings the balcony into the room; then come a yearly tenant and property management.

Illustrative photo

What we do for your flat

  1. 01

    The handover with Samana.

  2. 02

    The inspection for faults.

  3. 03

    Design and furnishing.

  4. 04

    A tenant, and the rent sent to you.

  5. 05

    Looking after it year to year.

Free updates and a handover plan

Your handover plan for Mykonos Signature

Write to us today. When the next inspection of Mykonos Signature is recorded, we tell you how much later your keys are likely to be.

100+properties handledNo needto fly in30 minto reply, any time

Your unit

Keep me updated

On a computer? Scan to open WhatsApp on your phone, with the message ready.