In Jebel Ali · by Sobha
Sobha Central Phase 1 handover date and construction status
Your Sobha Central Phase 1 keys are years away: the planned date is in mid 2030 and building is at the very start. What matters now is whether the pace picks up. We read each new inspection and tell you what it changes for your date.
Developer’s render · SobhaHandover date
Jun 2030The registered completion date. Your handover notice gives the date that counts.
Next step
A new inspectionThen the completion certificate and Sobha’s notice
Homes
2,3831- and 2-bedroom flats in four towers of 63 to 79 floors, shared with Phase 2
Developer
SobhaJebel Ali
Where Sobha Central Phase 1 is now, and the steps to your keys
Sobha Central Phase 1 construction update, and every step to your keys
Phase 1 has only just left the ground, though it is a little further along than the rest of Sobha Central. Most of the work, and most of the waiting, is still ahead. We send you each new inspection.
Sales opened
Sobha launched Sobha Central and put the first homes, in The Horizon, on sale.
Work started
The start date on the Land Department register.
Last inspection
7% built.
At the very start of building. The planned date, 30 June 2030, is still ahead.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Sobha starts sending handover notices.
Handover notice
Sobha asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Sobha the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Sources: Dubai Land Department; sales start: Sobha’s launch release.
Progress over time
Sobha Central Phase 1 completion date: is it fast enough?
Sobha Central Phase 1 is building far slower than its planned date with the Land Department needs. The two cards compare the speed since work began with the speed that date needs from now.
Source: Dubai Land Department
Speed so far
0.5% a month7% in the 14 months from August 2025 to the last inspection
Needed for 30 June 2030
~2.1% a monththe remaining 93% in the 45 months from the last inspection to the planned date
What this means
So far Phase 1 is far behind the speed the planned date needs. The first months of a tall tower are often slow, so the gap may narrow. Still, do not plan rent or travel around the planned date until inspections show a faster pace.
Buildings around
Phase 1 among the other parts of Sobha Central
Sobha Central is registered as three projects. The list shows each part being built, with its planned date. Phase 1 is further along than the other two phases.
Source: Dubai Land Department
What this means
Sobha Central Phase 2 shares the towers and the planned date, and The Pinnacle and The Mirage are planned for the end of 2031. If the phases finish as planned, thousands of one- and two-beds could reach tenants within about a year and a half of each other, and the first flats ready to let will start easiest.
Handover costs
Sobha Central Phase 1 handover costs to budget for
If you are on the payment plan most listings quote, the final instalment at handover is the biggest line. Sobha’s fees, the title deed fee and the DEWA deposit come with it.
Typical figures for 2026. Sobha’s bill has the exact amounts, and we check them with you line by line.
Furnish or not?
Furnish your Phase 1 flat, or let it empty?
A little over half the homes in Phase 1 are one-beds and the rest two-beds. With Sobha Central Phase 2 in the same towers, tenants will have a wide choice of similar one- and two-bed flats when the keys come.
Sobha Central Phase 1’s homes by layout
Which is yours?
Most homes here are 1-beds: 1,293 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
When many flats in one tower share a plan, a tenant notices the ones that are ready to live in. Interior design and furniture chosen for the layout help yours stand out and let sooner.
You have years to plan. Send us your tower and layout, and we show you what furnishing would cost and what it could add to the yearly rent.
While you wait
Phase 1: what to do while the towers go up
Four things to do now, so your Sobha Central Phase 1 handover goes smoothly from abroad.
Keep your instalments on time
If you are on the 60/40 plan, 60% is paid before handover, counting the booking payment, and 40% at handover. Keep each receipt, so Sobha’s final bill can be checked against them.
Decide who will check your flat
A flat high in a tower of up to 79 floors needs its cooling, windows, balcony doors and drains tested before you accept it. We do the flat inspection and send Sobha a dated list of faults.
Choose: live in it or let it
Decide early whether the flat is for you or for a tenant. A flat meant for letting needs a plan for furniture, photos and a listing, so the work can start the day you get the keys.
Follow every inspection
The planned date is 30 June 2030, but only the inspections show whether Phase 1 keeps to it. After each one we write to you with what it means for your keys.
Appoint Key Homes for your Sobha Central handover, and when the notice comes we check the bill, do the flat inspection and collect the keys.
The developer
Sobha handovers: how they work and who to call
How Sobha hands over homes, and how many of its projects are past their date.
About Sobha
Sobha sends each owner a handover notice with the final bill, and owners use the ONE Sobha app. Few of the projects Sobha is building are past their planned date. Sobha launched Sobha Central in May 2025.
Handover
How handover is booked
Sobha’s 47 projects in the Land Department records
- Finished23
- Being built, date still ahead yours13
- Being built, past their date1
- Being built, no finish date given10
Source: Dubai Land Department
What this means
Few of Sobha’s projects being built are past their date, but that says little about a project only just started. Phase 1 is ahead of the other two parts of Sobha Central, and the coming inspections will tell more. From abroad, you can leave the dealings with Sobha to us.
Write to us now and we follow Phase 1 for you, inspection by inspection, until Sobha’s handover notice is on its way.
Location
Where Sobha Central is: Sheikh Zayed Road, beside JLT
Sobha Central is going up on Sheikh Zayed Road in Jebel Ali, beside Jumeirah Lake Towers, a short drive from Dubai Marina. Sobha plans six towers here in all, with shops, offices and parks between them.
By car
Around you
Questions
Sobha Central Phase 1: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Sobha Central Phase 1 handover date?
The planned date for Sobha Central Phase 1, the completion date registered with the Dubai Land Department, is 30 June 2030. It was 7% built at the inspection of 29 September 2026. Completion comes first and the keys follow, so your own date will be in Sobha’s handover notice.
Is Sobha Central Phase 1 on time?
Not yet. Since work began it has been built at about 0.5% a month, and the planned date needs about 2.1% a month from now. The first months of a tall tower are often slow, so the speed may rise, but it would have to rise a lot. Each new inspection of Phase 1 will show if that happens.
What should I check in my Sobha Central flat before accepting it?
The cooling in every room, the windows and balcony doors, the taps, showers and drains, the kitchen fittings and the finish of walls and floors. Faults you report in writing before the keys are fixed by Sobha before you move in. If you are abroad, we do the flat inspection for you.
How much is due at the Sobha Central Phase 1 handover?
If you are on the 60/40 plan that most Sobha Central listings quote, 40% falls due at handover, and nothing after the keys. Sobha’s fees, the title deed fee and the DEWA deposit come on the same bill. Your sales agreement shows your own plan.
Can I take over my Sobha Central flat from abroad?
Yes, without flying to Dubai. When Sobha’s notice comes, we check the bill, do the flat inspection, open DEWA in your name and then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Sobha’s notice to a tenant in your Sobha Central flat
Until the keys, we follow every inspection at Phase 1. At handover we check Sobha’s bill, test the cooling and fittings in your flat and collect the keys. Then we offer interior design that makes your flat stand out among similar ones, find a tenant and take on property management.
What we do for your flat
- 01
The handover with Sobha.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Sobha Central Phase 1
Leave your details and we send you each new inspection of Sobha Central Phase 1, with what it means for your date.
On a computer? Scan to open WhatsApp on your phone, with the message ready.