Sobha Seahaven Tower B & C is being built at Dubai Harbour, and its planned date is almost two years away. We follow each Land Department inspection and tell you what it means for your keys.
Developer’s render · SobhaHandover date
Oct 2028The registered completion date. Your handover notice gives the date that counts.
Next step
A new inspectionThen the completion certificate and Sobha’s notice
Homes
4471, 2, 3, 4 and 6 bedrooms, in two towers of 48 and 56 floors
Developer
SobhaDubai Harbour
Where Seahaven Tower B & C is now, and the steps to your keys
Sobha Seahaven Tower B & C construction update and steps to keys
Sobha Seahaven Tower B & C is still in the first half of the work, yet further along than the other projects going up at Dubai Harbour. Once you sign up, we send you the result of each new inspection.
Sales opened
Sobha opened sales of Tower B, according to the launch coverage.
Work started
The start date on the Land Department register.
Last inspection
40% built.
Under construction. The planned date, 31 October 2028, is still ahead.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Sobha starts sending handover notices.
Handover notice
Sobha asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Sobha the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Sources: Dubai Land Department; sales start: launch coverage of Tower B (July 2023).
Progress over time
Sobha Seahaven Tower B & C completion date: on pace?
Sobha Seahaven Tower B & C is going up more slowly than its planned date needs: its pace so far, beside the pace it needs from now on.
Source: Dubai Land Department
Speed so far
1.1% a month40% in the 36 months from October 2023 to the last inspection
Needed for 31 October 2028
~2.4% a monththe remaining 60% in the 25 months from the last inspection to the planned date
What this means
So far the towers have gone up at a slower pace than the planned date needs, and they would have to more than double it from now on. Plan for keys later than the planned date, but keep your last payment ready: the next inspections will show whether the work has picked up.
Buildings around
Sobha Seahaven Tower B & C and the towers around it
Sobha Seahaven Tower B & C is further along than the other projects being built at Dubai Harbour; six of them are listed here by progress on the record.
Source: Dubai Land Department
What this means
Sobha Seahaven Tower A, both DAMAC Bay towers and the two Dubai Harbour Residences buildings are at a similar stage on the record, though their planned dates differ. If several finish in the same year, tenants will have many new flats to compare, so have yours ready to show soon after you get the keys.
Handover costs
Sobha Seahaven Tower B & C handover costs
If you are on one of the plans quoted for Seahaven Tower B & C, the last instalment is the biggest line on your bill. Your plan sets its size.
Typical figures for 2026. Sobha’s bill has the exact amounts, and we check them with you line by line.
Furnish or not?
Sobha Seahaven Tower B & C: furnish or let empty?
At Sobha Seahaven Tower B & C almost half the homes are two-beds, and Sobha Seahaven Tower A and DAMAC Bay by Cavalli are among the Dubai Harbour projects at a similar stage, so tenants will have many new flats to compare.
Seahaven Tower B & C’s homes by layout
Which is yours?
The most common home here is the 2-bed: 214 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
Where many new flats reach tenants at once, interior design and well-chosen furniture make yours stand out in the photographs. A furnished flat is ready to move into, which usually shortens the wait for the first tenant.
Share your layout with us, and we send back a furnishing plan, what it costs, and the rent you could expect either way.
While you wait
Sobha Seahaven Tower B & C: while you wait
Four things to do now, so your Seahaven Tower B & C handover goes smoothly from abroad.
Keep instalments on time
If you are on one of the quoted plans, you pay in stages while the towers rise, and the last share falls due with Sobha’s handover notice. Put that sum aside over the next two years.
Choose who checks the flat
On high floors by the sea, the windows and seals need a close look, and the 4-bed and 6-bed homes take longer to check. We do the flat inspection at Seahaven and send Sobha the faults in writing.
Live in it or let it
Decide before the notice whether the flat is for you or for a tenant. If it is for a tenant, furniture and photos can follow soon after you get the keys.
Follow each inspection
The planned date is the end of October 2028, and the towers were 40% built in September 2026. Each time a new inspection is recorded, we tell you whether it moves your keys.
We run your Seahaven handover while you stay abroad: we check the bill, do the flat inspection, open DEWA and collect the keys. You make the payment.
The developer
Sobha handovers: how they work and who to call
How Sobha hands over homes, and how many of its projects are past their date.
About Sobha
When a Sobha building is ready, each owner gets a handover notice with the bill, and the home orientation visit is booked through the ONE Sobha app. Towers B and C are among the Sobha projects being built with their planned date still ahead.
Handover
How handover is booked
Sobha’s 47 projects in the Land Department records
- Finished23
- Being built, date still ahead yours13
- Being built, past their date1
- Being built, no finish date given10
Source: Dubai Land Department
What this means
Only one of the Sobha projects being built has passed its planned date, but that says little about yours. At the pace so far, Towers B and C may finish late, though they are further along than the projects around them. We act on Sobha’s notice for you.
Write to us now, and we let you know when Sobha sends its notice for Seahaven Tower B & C and what it asks of you.
Location
Sobha Seahaven Tower B & C location, and what is around it
Sobha Seahaven Tower B & C is at Dubai Harbour, the waterfront between Palm Jumeirah and Dubai Marina, about five minutes by car from Sheikh Zayed Road. Dubai Marina Mall is about ten minutes away.
By car
Around you
Questions
Seahaven Tower B & C: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Sobha Seahaven Tower B & C handover date?
The completion date registered with the Dubai Land Department for Sobha Seahaven Tower B & C, which we call the planned date, is 31 October 2028. Towers B and C were 40% built at the inspection of 18 September 2026. The date for your own flat is the one in the notice Sobha sends you.
Is Sobha Seahaven Tower B & C on time?
Not at the pace so far. Since the work started in October 2023, the towers have gone up by about 1.1% a month, and they need about 2.4% a month from the September inspection to meet the planned date. The next inspections will show whether the work has picked up.
What should I check in my Seahaven flat before the keys?
On a high floor, look at the windows and balcony doors for leaks and drafts, and check the seals around them. Run the cooling in every room, and run every tap and shower to check the water pressure and drains. Every fault goes to Sobha in writing before you sign for the flat.
How much do I pay at the Sobha Seahaven Tower B & C handover?
Your plan sets the last payment: if you are on one of the plans quoted in listings, 20% or 40% is due at handover. The DEWA and cooling deposits, the service charge in advance and the title deed fee come with it. Check the schedule in your own sales agreement before the notice comes.
Can I receive my Seahaven Tower B & C flat from abroad?
Yes. Our team in Dubai reads Sobha’s bill with you, does the flat inspection, opens DEWA in your name and picks up the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Sobha’s notice to a tenant in your Seahaven flat
For your Seahaven Tower B & C flat we follow the inspections, check the bill and test the windows, balcony doors and cooling before you sign. Then come interior design, furniture and a tenant on a yearly lease, and we carry on with property management.
What we do for your flat
- 01
The handover with Sobha.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Seahaven Tower B & C
Leave your details, and we write when the next inspection of Sobha Seahaven Tower B & C is recorded, with what it means for your keys.
On a computer? Scan to open WhatsApp on your phone, with the message ready.