In Jumeirah Lake Towers · by Sobha
Verde by Sobha handover date, and how close it is
Verde has a planned date in the middle of next year, and Sobha itself still talks of an earlier finish. Either way the tower is in its last stretch. We follow each inspection and get your handover ready before the notice comes.
Developer’s render · SobhaHandover date
December 2026Sobha’s estimate. Your handover notice gives the date that counts.
Next step
The completion certificateThen Sobha’s handover notice
Homes
6061 to 3 bedrooms, in one tower
Developer
SobhaJumeirah Lake Towers
Where Verde is now, and the steps to your keys
How far Verde has come, and the steps to your keys
Verde is the second furthest along of the towers being built in JLT, behind only Me Do Re 2. We send you each new inspection the day it appears, and what it means for your keys.
Work started
The date registered with the Land Department.
Last inspection
85% built.
Still being built. The planned date of June 2027 is ahead, and Sobha’s own estimate is December 2026.
New inspection results
We send you each one the day it appears. Progress over time →
100% and the completion certificate
After that, Sobha starts sending handover notices.
Handover notice
Sobha asks for the last payment and the fees, and tells you when the flat inspection and the key collection can be booked. We book both for you.
Snagging
We check the flat before you accept the keys, and send Sobha the list of faults.
Keys
We open the utility accounts in your name, then collect the keys. If the developer requires a power of attorney, we arrange it with you remotely.
Furnishing
If you want it furnished, we design and furnish the flat so it is ready for a tenant.
Your first tenant
We advertise the flat, find a tenant on a yearly contract and send the rent to you abroad.
Source: Dubai Land Department.
Progress over time
Will Verde be ready by June 2027?
Verde’s progress is set against its planned date in the chart. One card gives the speed since work began, the other the speed needed from the last inspection to the planned date.
Source: Dubai Land Department
Speed so far
2.1% a month85% in the 41 months from April 2023 to the last inspection
Needed for 30 June 2027
~1.5% a monththe remaining 15% in the 10 months from the last inspection to the planned date
What this means
Verde is being built faster than it needs to be, so the planned date looks within reach, and finishing in the spring of 2027 is possible. December 2026, Sobha’s date, would need a much quicker finish than the tower has shown. Plan around the first half of 2027.
Handover costs
What Sobha will ask for at the Verde handover
The largest line will be the last share of what your flat costs, and for Verde its size depends on your plan. Listings quote two different plans, so read your sales agreement first.
Typical figures for 2026. Sobha’s bill has the exact amounts, and we check them with you line by line.
Snagging
The flat inspection at Verde, before you take the keys
Your flat inspection falls between Sobha’s handover notice and the day you sign for the keys. Sobha mends what is listed in that window. At Verde, these four points matter most.
Book the flat inspection early
Sobha will be handing over homes all over Dubai at the same time as Verde. Its desk will be busy, so we ask for your date on the day your notice arrives.
Seals and pressure high up
Verde rises more than 60 floors. Wind and rain press on the windows and balcony doors up high, and water must climb far, so we test them for leaks and every tap for pressure.
Cooling under a summer load
If your keys come near the planned date, it will be summer. We check every room’s air conditioning while it works hardest, so a fault is listed before you sign.
Water that reaches the flat below
Each flat sits over another. We run every shower, basin and sink and watch the drains, because a hidden leak ends up in your neighbour’s ceiling.
What this means
Faults are Sobha’s to fix at no cost, as long as they are on the written list before you accept the keys. Keep photographs with the list, and see every repair done before signing.
We carry out the flat inspection at Verde for you, from AED 1,599, and follow up with Sobha until each fault on the list is closed.
Furnish or not?
Furnish your Verde flat, or let it empty?
Verde has exactly as many one-beds as two-beds, with a smaller number of three-beds. Apart from Me Do Re 2, the next new tower, UH West, is far behind, so your flat will mainly compete with finished towers such as Orra The Embankment.
Verde’s homes by layout
Which is yours?
The most common home here is the 1-bed: 272 of them.
Source: Dubai Land Department
A similar flat in another building, empty and furnished


- ✓Stands out next to similar flats on rental websites
- ✓Tenants see how they would live in it
- ✓Ready to move into, for tenants who don’t want to buy furniture
What this means
Against older towers, a new flat stands out more easily, and good interior design and furniture make the most of that. A furnished flat that a tenant can move into at once is likely to be let sooner.
Send us your layout and floor. We answer with a furnishing proposal, what it costs, and the rent to expect with and without furniture.
Buildings around
Verde among the towers going up in JLT
Eight other towers are being built in JLT, and only Me Do Re 2 is further along than Verde. The list shows how far each is, and its date.
Already finished
Being built
Source: Dubai Land Department
What this means
Me Do Re 2 should reach tenants first, and the next tower behind Verde, UH West, is a long way back. So when Verde is handed over, few other new flats in JLT will compete with it. Tenants will compare it with towers already lived in, such as Me Do Re, MBL Royal and Orra The Embankment.
The developer
How Sobha hands over, and how it keeps its dates
How Sobha hands over homes, and how many of its projects are past their date.
About Sobha
Sobha writes to each owner with the handover notice and the bill. One of its 24 projects being built is past its planned date. Verde is not: its date is still well ahead.
Handover
How handover is booked
Sobha’s 47 projects in the Land Department records
- Finished23
- Being built, date still ahead yours13
- Being built, past their date1
- Being built, no finish date given10
Source: Dubai Land Department
What this means
Sobha’s record, and Verde being further along than every JLT tower but one, point the same way: keys in the first half of 2027, by the planned date. If you live abroad, we answer Sobha’s notice for you.
Write to us now, and we tell you as soon as Sobha starts sending notices for Verde, with what your notice will ask you to pay.
Location
Where Verde is: Jumeirah Lake Towers, by the Emirates Golf Club
Verde stands in the middle of JLT, a district of towers around small lakes, with the Emirates Golf Club across the road and Jumeirah Islands beside it. Sheikh Zayed Road and two Red Line metro stations are close by.
By car
Around you
Questions
Verde: what owners ask
Something not here? Ask us on WhatsApp; we reply within 30 minutes.
When is the Verde by Sobha handover date?
Verde by Sobha’s planned date, meaning the completion date registered with the Dubai Land Department, is 30 June 2027. Sobha has said December 2026. Verde was 85% built at the inspection of 24 August 2026. The keys follow completion, and your own date will be in Sobha’s handover notice.
Is Verde by Sobha on schedule?
Yes, Verde by Sobha is on schedule for the planned date. It has been built at about 2.1% a month, and needs only 1.5% a month to be finished by the end of June 2027. At the speed so far it would be finished around April 2027. December 2026 looks too soon.
What should I check in my Verde flat before the keys?
The windows and balcony doors on high floors, the water pressure at each tap, the air conditioning in every room and every drain. Sobha mends what is on your written list before you accept the keys, so book the flat inspection early.
How much do I pay Sobha at the Verde handover?
The last share of your purchase amount, which depends on your plan. Listings quote two plans: if you are on 60/40, 40% is due at completion, and if you are on 80/20, 20%. Your sales agreement shows yours. On top come Sobha’s fees, the service charge paid in advance, the DEWA and cooling deposits, and the title deed fee.
Can I take over my Verde flat without travelling to Dubai?
Yes. We check Sobha’s bill, do the flat inspection, open the DEWA account in your name and collect the keys for you. If the developer requires a power of attorney, we arrange it with you remotely.
Our service
From Sobha’s notice to a tenant in your Verde flat
For Verde we book the flat inspection the day the notice arrives, check Sobha’s bill against your agreement, test the seals on the high floors and the cooling, and collect the keys. Then interior design, a tenant on a yearly contract, and property management for as long as you like.
What we do for your flat
- 01
The handover with Sobha.
- 02
The inspection for faults.
- 03
Design and furnishing.
- 04
A tenant, and the rent sent to you.
- 05
Looking after it year to year.
Free updates and a handover plan
Your handover plan for Verde
Leave your details and your layout, and we send a handover plan for your Verde flat, with an early estimate of what the handover will cost.
On a computer? Scan to open WhatsApp on your phone, with the message ready.