DAMAC Lagoons handover date: every phase, and where it stands
33 phases and about 15,000 homes. Seven phases are finished and handing over, and the rest follow one by one until 2030. Find yours to see how far it is built and its date.
- Every phase by % built and date
- Late phases marked
- We talk to DAMAC for you
- Villa snagging, keys, interior and a tenant
Check the phase number on your purchase contract
Each DAMAC Lagoons cluster is split into phases with their own dates. A date you find online is often for a different phase, so match the phase number on your purchase contract first.
Construction update: find your phase
Each tile is one phase. The bigger the tile, the more homes it has. Tap yours to check it.
17 phases · 8,811 homes · 7 finished
Next to finish
Next to finish
Next to finish
Dubai Land Department inspection records, read in October 2026. Homes per phase as registered. “Was due” is a registered completion date that has passed.
From first keys to the last phase
Finished phases first, then each year by its registered date.
Done
7 phases finished
2025
8 phases, all past their date
2027
5 phases due
2028
1 phase due
2030
2 phases due
10 phases have no published date yet.
Five steps from finished to keys
Each phase hands over on its own. This is the order once yours is finished.
- STEP 1Phase finished
It reaches 100% and the Land Department records it as finished.
Day 0 - STEP 2DAMAC’s notice
An email with your final balance, the fees and a window to book.
Weeks after - STEP 3Pay and open DEWA
The balance and fees, then DEWA in your name; the DEWA deposit comes back.
Week 1–2 - STEP 4Villa snagging
Every defect inside and out, in a written report, then re-checked.
Week 2 - STEP 5Keys and title deed
Keys handed over and the title deed issued. If the developer requires a power of attorney, we arrange it with you remotely. Installation defects can still be raised for one year from completion.
Week 2–4
Typical order. DAMAC’s notice sets the real dates for your phase.
The bill, line by line
Check each line against your statement before you pay.
| Item | Amount | Paid to | Comes back? |
|---|---|---|---|
| Final balance | Per your statement | DAMAC | No |
| DEWA deposit | AED 4,000 villa · AED 2,000 flat | DEWA | Yes, when you close the account |
| Handover and admin fees | Listed on your notice | DAMAC | No |
| Service charge | From your handover date | The owners association, through Mollak | No |
| Title deed and map | About AED 580 | Dubai Land Department | No |
DEWA; Dubai Land Department; DAMAC handover notices. Your statement has the exact figures.
What a new villa needs after the keys
A new villa usually comes with a bare plot and empty rooms. We take it from there, inside and out.
Villa snagging
Inside and out: walls, roof, wet areas, plot levels and drainage, while DAMAC still has to fix them.
Snagging →Keys and utilities
DEWA, access cards and parking, set up before you arrive or before the tenant moves in.
Handover management →Interior design and furnishing
A design for your villa alone, furnished to the last detail.
Interior design →A long-term tenant
A family we have checked, on a registered Ejari contract.
Long-term rental →Management after that
Repairs, renewals and the service charge handled, while you keep receiving rental income.
Property management →From abroad
We do each step in Dubai and send you photos and the paperwork, so you never need to fly in.
For owners abroad →One team for the whole chain
From DAMAC’s notice to rental income, and we talk to DAMAC for you.
- 1We talk to the developerEarliest snagging and key dates
- 2We check the final billBefore you pay anything
- 3SnaggingDefects listed, then re-checked
- 4Keys and utilitiesDEWA, cooling, access cards
- 5Interior designA design project for your home
- 6Long-term tenantA checked tenant on Ejari
- 7ManagementRepairs, renewals, the next tenant
DAMAC Lagoons, asked and answered
When will my phase hand over?
Find it above. Each tile shows how far the phase is built and its Land Department date. Phases at 100% are finished and handing over; the others follow one by one until 2030.
Why does my phase show a date that has passed?
“Was due” is the completion date registered with the Land Department. Eight phases are past it, most of them above 75% built. The % built shows how close yours is.
Is the date I found online for my phase?
Often not. Each cluster has several phases with their own dates, so check the phase number on your purchase contract and match it here.
What do I pay at handover?
The final balance, DAMAC’s handover and admin fees, the DEWA deposit (AED 4,000 for a villa, AED 2,000 for a flat), the service charge from your handover date and the title deed fee. Send us your statement and we check every line.
Do I need to be in Dubai for the keys?
No. We collect your keys, do the snagging and open DEWA for you. If DAMAC requires a power of attorney, we arrange it with you remotely.
Is there a page for my cluster?
Portofino and Malta have their own pages, linked from their tiles. For any other phase, message us and we check it for you.
Tell us your phase
We reply within 30 minutes with its real status, your dates and the steps to the keys, and we talk to DAMAC for you.