Snagging inspection

Snagging company in Dubai: every defect found before the keys

New homes are rarely perfect. Cracks, hollow tiles, leaks and weak air conditioning are the developer’s to fix. The developer fixes them only when someone finds them and puts them on record. We find them and send the list to the developer.

PriceFrom AED 1,599for a flat
ReportSame daya photo of every defect
Second checkIncludedafter the fixes
  • No need to fly in
  • The report goes to you and to the developer
  • We check every fix again
  • Villas and townhouses too
WHAT SNAGGING IS

What snagging means

Snagging is a check of a new home for faults before you take the keys. An inspector goes through every room, lists each defect with a photo, and the developer fixes them at no cost to you.

In Dubai the developer must fix faulty installations for one year from the completion certificate, and the structure for ten years. A fault on record before the keys is the easiest one to get fixed.

WHAT WE CHECK

What a snagging inspection checks

We check hundreds of points in every home. These eight areas cost owners the most when a fault is missed.

Walls and paint

Cracks, damp, uneven plaster, patchy paint and gaps at the joints.

Floors and tiles

Hollow or cracked tiles, uneven floors, grout and skirting.

Doors and windows

How they close, locks, seals, glass, and sliding doors that stick.

Plumbing

Water pressure, leaks, drains, hot water, every tap and every toilet.

Electrics

Every socket, switch and light, the fuse board and the earthing.

Air conditioning

Cooling in every room, the thermostats, noise and leaks from the units.

Kitchen and wardrobes

Cabinets, hinges, worktops, built-in appliances and wardrobe fittings.

Balcony and outside

Railings, waterproofing and drains. For villas, also the roof and the garden.

HOW IT WORKS

From booking to the keys

  1. STEP 1Book

    The developer sets the inspection date. We ask for the earliest one.

    When the notice comes
  2. STEP 2Inspect

    Our inspector checks the home room by room, with tools.

    A few hours
  3. STEP 3Report

    We send the report with photos to you and to the developer.

    Same day
  4. STEP 4Check again

    After the developer’s fixes, we check every item again.

    Included
  5. STEP 5 · YOUKeys

    You collect the keys, or we collect them for you. If the developer requires a power of attorney, we arrange it with you remotely.

THE PRICE

Snagging cost in Dubai

Snagging, flat
from AED1,599

The exact price depends on the size of your home. We quote villas and townhouses after we know the plot and the floors.

  • We check every room with tools
  • You get a report with a photo of every defect
  • We send the report to the developer
  • We check again after the fixes
Get a fixed price
Snagging report1 bed · page 3 of 14
Living room: hairline crack above the windowNorth wall, 40 cm
Must fix
Kitchen: hollow floor tileThird row from the window
Must fix
Bedroom: wardrobe door rubs the frameRight-hand door
Adjust
23 items foundHow a page looks

Has your handover notice arrived?

Book the snagging as soon as it does. We reply with a fixed price within 30 minutes.

Get my snagging price
THE REPORT

A snagging report, page by page

01

One line per defect

Each line says the room, where the fault is and what it is, with a photo and its size.

02

Must fix or adjust

We mark each item as a fault the developer must fix, or a small adjustment.

03

The developer’s copy

We send the same report to the developer, so nobody argues later about what was on the list.

VILLAS AND TOWNHOUSES

Snagging villas and townhouses

01

The roof and the outside walls

We check the roof for leaks and drains, and the outside walls for cracks and gaps.

02

The garden and the plot

We check the levels, the drains, the boundary walls and the irrigation points.

03

The pool, if there is one

We check the tiles, the pump room, the lights and the water level over a few hours.

WHAT’S LEFT FOR YOU

You read the report. We do the rest.

You do

Your part

  • 1Tell us your building and type of home
  • 2Read the report we send you
  • 3Decide if we collect the keys for you
We do

Everything else

  • Talk to the developer
  • Book the earliest date
  • Check every room
  • Photograph every defect
  • Send the report to the developer
  • Follow up the fixes
  • Check every fix again
  • Collect the keys, if you want
HANDING OVER NOW

Buildings handing over now

If your building is on this list, it is time to book the snagging.

All Dubai handover dates →

Source: Dubai Land Department.

QUESTIONS

Snagging: what owners ask

We reply within 30 minutes.

How much does snagging cost in Dubai?

Our snagging starts from AED 1,599 for a flat, with the report and the second check included. The exact price depends on the size of the home. We quote villas and townhouses after we know the plot and the floors.

Is snagging worth it on a brand new home?

Yes. New homes almost always have some faults, and the developer must fix them at no cost to you. A fault on record before the keys is the easiest one to get fixed, and you avoid paying for it later.

Can I do the handover from abroad?

Yes. We inspect the home, send you the report with photos and follow up the fixes with the developer. If the developer requires a power of attorney, we arrange it with you remotely.

What if the developer will not fix something?

We follow it up with the developer and keep it on the list until it is fixed. You can still report faults after the keys, during the developer’s one-year defects period.

How long is the defects liability period in Dubai?

The developer must fix faulty installations for one year from the completion certificate, and the structure for ten years. The year starts at completion, not on the day you get the keys, so it may be shorter than you think. Our defects period guide explains how to claim.

Do you snag villas and townhouses?

Yes. For a villa or townhouse we also check the roof, the outside walls, the garden and the pool where there is one. We quote them after we know the plot and the floors.

I already have the keys. Is it too late?

No. We can still inspect the home and report the faults to the developer while the defects period runs. After it ends, repairs are your cost, so it is worth doing soon.

Free, reply within 30 minutes

Get a fixed snagging price

Tell us your building and the type of home. We reply within 30 minutes with the price and the earliest date we can inspect.