Snagging company in Dubai: every defect found before the keys
New homes are rarely perfect. Cracks, hollow tiles, leaks and weak air conditioning are the developer’s to fix. The developer fixes them only when someone finds them and puts them on record. We find them and send the list to the developer.
- No need to fly in
- The report goes to you and to the developer
- We check every fix again
- Villas and townhouses too
What snagging means
Snagging is a check of a new home for faults before you take the keys. An inspector goes through every room, lists each defect with a photo, and the developer fixes them at no cost to you.
In Dubai the developer must fix faulty installations for one year from the completion certificate, and the structure for ten years. A fault on record before the keys is the easiest one to get fixed.
What a snagging inspection checks
We check hundreds of points in every home. These eight areas cost owners the most when a fault is missed.
Walls and paint
Cracks, damp, uneven plaster, patchy paint and gaps at the joints.
Floors and tiles
Hollow or cracked tiles, uneven floors, grout and skirting.
Doors and windows
How they close, locks, seals, glass, and sliding doors that stick.
Plumbing
Water pressure, leaks, drains, hot water, every tap and every toilet.
Electrics
Every socket, switch and light, the fuse board and the earthing.
Air conditioning
Cooling in every room, the thermostats, noise and leaks from the units.
Kitchen and wardrobes
Cabinets, hinges, worktops, built-in appliances and wardrobe fittings.
Balcony and outside
Railings, waterproofing and drains. For villas, also the roof and the garden.
From booking to the keys
- STEP 1Book
The developer sets the inspection date. We ask for the earliest one.
When the notice comes - STEP 2Inspect
Our inspector checks the home room by room, with tools.
A few hours - STEP 3Report
We send the report with photos to you and to the developer.
Same day - STEP 4Check again
After the developer’s fixes, we check every item again.
Included - STEP 5 · YOUKeys
You collect the keys, or we collect them for you. If the developer requires a power of attorney, we arrange it with you remotely.
Snagging cost in Dubai
The exact price depends on the size of your home. We quote villas and townhouses after we know the plot and the floors.
- We check every room with tools
- You get a report with a photo of every defect
- We send the report to the developer
- We check again after the fixes
Must fix
Must fix
Adjust
Has your handover notice arrived?
Book the snagging as soon as it does. We reply with a fixed price within 30 minutes.
A snagging report, page by page
One line per defect
Each line says the room, where the fault is and what it is, with a photo and its size.
Must fix or adjust
We mark each item as a fault the developer must fix, or a small adjustment.
The developer’s copy
We send the same report to the developer, so nobody argues later about what was on the list.
Snagging villas and townhouses
The roof and the outside walls
We check the roof for leaks and drains, and the outside walls for cracks and gaps.
The garden and the plot
We check the levels, the drains, the boundary walls and the irrigation points.
The pool, if there is one
We check the tiles, the pump room, the lights and the water level over a few hours.
You read the report. We do the rest.
Your part
- 1Tell us your building and type of home
- 2Read the report we send you
- 3Decide if we collect the keys for you
Everything else
- Talk to the developer
- Book the earliest date
- Check every room
- Photograph every defect
- Send the report to the developer
- Follow up the fixes
- Check every fix again
- Collect the keys, if you want
Buildings handing over now
If your building is on this list, it is time to book the snagging.
Source: Dubai Land Department.
Snagging: what owners ask
We reply within 30 minutes.
How much does snagging cost in Dubai?
Our snagging starts from AED 1,599 for a flat, with the report and the second check included. The exact price depends on the size of the home. We quote villas and townhouses after we know the plot and the floors.
Is snagging worth it on a brand new home?
Yes. New homes almost always have some faults, and the developer must fix them at no cost to you. A fault on record before the keys is the easiest one to get fixed, and you avoid paying for it later.
Can I do the handover from abroad?
Yes. We inspect the home, send you the report with photos and follow up the fixes with the developer. If the developer requires a power of attorney, we arrange it with you remotely.
What if the developer will not fix something?
We follow it up with the developer and keep it on the list until it is fixed. You can still report faults after the keys, during the developer’s one-year defects period.
How long is the defects liability period in Dubai?
The developer must fix faulty installations for one year from the completion certificate, and the structure for ten years. The year starts at completion, not on the day you get the keys, so it may be shorter than you think. Our defects period guide explains how to claim.
Do you snag villas and townhouses?
Yes. For a villa or townhouse we also check the roof, the outside walls, the garden and the pool where there is one. We quote them after we know the plot and the floors.
I already have the keys. Is it too late?
No. We can still inspect the home and report the faults to the developer while the defects period runs. After it ends, repairs are your cost, so it is worth doing soon.
Get a fixed snagging price
Tell us your building and the type of home. We reply within 30 minutes with the price and the earliest date we can inspect.