Defects liability period in Dubai: what the developer must still fix
Under Dubai Law No. 6 of 2019, the developer must fix faulty installations for one year from the building’s completion certificate, and structural defects for ten years. You report defects in writing; the developer repairs them at its own cost.
What the law says
Dubai Law No. 6 of 2019 on jointly owned property makes the developer liable for:
- installations, such as electrics, plumbing, air conditioning and fittings, for one year;
- the structure, such as foundations, columns and walls that carry the building, for ten years.
Both periods start from the date of the completion certificate, not from your handover. If you get your keys months after completion, part of the first year has already gone.
An owner who collects the keys late finds the one year nearly over. Snag as early as you can, and report what you find straight away.
What is covered, and what is not
Covered: faults in how the home was built or fitted, such as leaks from pipes, failed AC units, faulty wiring, doors that warp, cracks in the structure.
Not covered: wear and damage from use, changes you made, and items you bought yourself. Common areas are handled through the owners association and its management company.
How to claim
- Report the defect to the developer’s customer care or app, in writing, with photos and the date you found it.
- Keep the reference number and every reply.
- Agree the visit and the repair date.
- If the developer does not act, take it up with RERA, and keep your written record as proof.
When we manage your home, we report defects for you within the period, follow the repair and check it is done properly.
Buildings handing over now
Owners in these buildings are going through the handover now.
Dubai Land Department inspection records, read in October 2026.
Read next
Defects liability period, asked and answered
How long is the defects liability period in Dubai?
One year for installations and ten years for the structure, both from the building’s completion certificate, under Law No. 6 of 2019.
Does it start when I get the keys?
No. It starts from the completion certificate. If your handover is late, less of the first year is left.
Who pays for the repair?
The developer, for defects in how the home was built or fitted. Damage from use is the owner’s.
What if the developer ignores my report?
Keep your written reports and replies, and raise it with RERA.
Where this comes from
- Dubai Law No. 6 of 2019 on jointly owned property
- RERA, owners’ rights in jointly owned property