At handover

Snagging checklist: what to check in a new home, room by room

Guide6 minutes to read

Snagging means finding the defects in a new home before you accept the keys, so the developer fixes them at its own cost. Go room by room, test everything that moves, runs or switches on, and report each defect in writing with a photo.

WhenBefore the keysat the developer’s inspectionHandover
WhatEvery defectlisted with a photoYour snagging report
After the keysOne yearfor installation defectsDubai Law No. 6 of 2019

What is snagging?

A snag is a defect in a new home: a crack, a door that sticks, a leak, a loose tile. Snagging is checking the home for them before you accept it. The developer has to fix what you list, so the more you find before the keys, the less you deal with later.

What to take

  • A phone for photos, with a torch;
  • a spirit level and a tape measure;
  • a socket tester or a phone charger to test sockets;
  • masking tape to mark defects;
  • a copy of the floor plan from your purchase contract.

Room by room

Walls and ceilings: cracks, uneven paint, damp patches, gaps at the joins.

Floors: hollow or cracked tiles (tap them), uneven joints, scratches, skirting gaps.

Doors and windows: they open, close and lock smoothly; seals are whole; no gaps or draughts; glass is not scratched.

Bathrooms: water pressure and hot water at every tap; drains run fast; no leaks under basins; silicone is complete; tiles fall towards the drain.

Kitchen: cabinets and drawers close; worktops are not chipped; appliances work; the sink drains; no leaks under it.

Electrics: every switch, socket and light works; the distribution board is labelled.

Air conditioning: each room cools; thermostats respond; no noise or drips from the units.

Balcony or garden: railings are firm; water drains away; for a villa, the plot levels and drainage, the roof and the outside walls.

How to report the defects

  1. List each defect with its room, a short description and a photo.
  2. Send the list to the developer through its app or customer care, and keep the reference.
  3. Ask for the date the fixes will be done.
  4. Check again after the fixes, before or soon after you sign for the keys.
Where owners get stuck

Defects reported by phone only are easy to lose. Always report in writing and keep the reply.

Defects found after the keys

The developer remains liable for installation defects, such as plumbing, electrics and air conditioning, for one year from the completion certificate, and for structural defects for ten years. See the defects period guide.

What we do

Our inspectors snag the home with thermal and moisture tools, write the report, send it to the developer and check again after the fixes. Snagging starts from AED 1,599 for a flat.

HANDING OVER NOW

Buildings handing over now

Owners in these buildings are going through the handover now.

All handover dates →
BuildingStageBuiltDate

Dubai Land Department inspection records, read in October 2026.

READ NEXT

Read next

QUESTIONS

Snagging checklist, asked and answered

What does snagging mean?

Finding and listing the defects in a new home before you accept it, so the developer fixes them.

Can I do the snagging myself?

Yes, with this checklist. An inspection company adds tools such as thermal cameras and moisture meters, and finds hidden leaks and gaps you cannot see.

Does the developer allow an inspection company?

Most do. Some ask for a signed letter from you naming the company. Check with the developer when you book.

What if a defect appears after I move in?

Report it to the developer in writing. Installation defects are covered for one year from completion, and structural defects for ten years.